<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <channel>
    <title>DEV Community: Eximp Measurement </title>
    <description>The latest articles on DEV Community by Eximp Measurement  (@eximp_measurement).</description>
    <link>https://dev.to/eximp_measurement</link>
    <image>
      <url>https://media2.dev.to/dynamic/image/width=90,height=90,fit=cover,gravity=auto,format=auto/https:%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Fuser%2Fprofile_image%2F4087530%2F155f5dd6-a64e-4a8d-913a-23cfd3ebfd18.png</url>
      <title>DEV Community: Eximp Measurement </title>
      <link>https://dev.to/eximp_measurement</link>
    </image>
    <atom:link rel="self" type="application/rss+xml" href="https://dev.to/feed/eximp_measurement"/>
    <language>en</language>
    <item>
      <title>Why Pulse Flow Meter Readings Go Wrong: A Practical Guide to PLC High-Speed Counters</title>
      <dc:creator>Eximp Measurement </dc:creator>
      <pubDate>Fri, 30 Oct 2026 08:25:37 +0000</pubDate>
      <link>https://dev.to/eximp_measurement/why-pulse-flow-meter-readings-go-wrong-a-practical-guide-to-plc-high-speed-counters-4aa8</link>
      <guid>https://dev.to/eximp_measurement/why-pulse-flow-meter-readings-go-wrong-a-practical-guide-to-plc-high-speed-counters-4aa8</guid>
      <description>&lt;p&gt;Pulse output flow meters are commonly used in industrial automation to measure liquid and gas flow. They provide a digital signal that a PLC or flow computer can count to calculate flow rate and accumulated quantity.&lt;/p&gt;

&lt;p&gt;The principle sounds simple: the meter generates pulses, the controller counts them, and the total count represents the quantity that has passed through the pipeline.&lt;/p&gt;

&lt;p&gt;However, real installations are not always that straightforward.&lt;/p&gt;

&lt;p&gt;Incorrect pulse scaling, missed counts, electrical noise, slow PLC scan times and poor wiring practices can all affect the final measurement. In some applications, the displayed flow total may be incorrect even when the flow meter itself is operating normally.&lt;/p&gt;

&lt;p&gt;Let's examine how pulse-based measurement works and how to troubleshoot common problems.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;How Does a Pulse Output Flow Meter Work?&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;A pulse output flow meter generates electrical pulses corresponding to a defined quantity of fluid.&lt;/p&gt;

&lt;p&gt;For example, suppose a flow meter has a K-factor of:&lt;/p&gt;

&lt;p&gt;100 pulses per litre&lt;/p&gt;

&lt;p&gt;This means that every 100 pulses represent one litre of measured fluid.&lt;/p&gt;

&lt;p&gt;If the PLC receives 10,000 pulses, the accumulated volume is:&lt;/p&gt;

&lt;p&gt;Volume = Total pulses / K-factor&lt;/p&gt;

&lt;p&gt;Volume = 10,000 / 100&lt;/p&gt;

&lt;p&gt;Volume = 100 litres&lt;/p&gt;

&lt;p&gt;The K-factor may be expressed in pulses per litre, pulses per cubic metre or another unit depending on the meter configuration.&lt;/p&gt;

&lt;p&gt;Before implementing the calculation, always verify the unit and scaling information provided by the meter manufacturer.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;Why a Normal PLC Input May Miss Pulses&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;One common mistake is connecting a high-frequency pulse output to an ordinary digital input without checking the input's switching capability.&lt;/p&gt;

&lt;p&gt;Most PLCs execute their programs in scan cycles. During each scan, the controller reads inputs, executes logic and updates outputs.&lt;/p&gt;

&lt;p&gt;If pulses arrive faster than the input module or input-processing method can detect, some transitions may be missed.&lt;/p&gt;

&lt;p&gt;Consider an example:&lt;/p&gt;

&lt;p&gt;Pulse frequency: 2,000 Hz&lt;/p&gt;

&lt;p&gt;Time between pulses: 0.5 milliseconds&lt;/p&gt;

&lt;p&gt;PLC scan time: 10 milliseconds&lt;/p&gt;

&lt;p&gt;The PLC may execute several scans during the interval in which multiple pulses arrive.&lt;/p&gt;

&lt;p&gt;Depending on the input module and its hardware filtering, the controller may not register every transition.&lt;/p&gt;

&lt;p&gt;This is why ordinary digital inputs should not automatically be assumed suitable for high-frequency pulse counting.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;When Should You Use a High-Speed Counter?&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;A High-Speed Counter (HSC) is designed to count input pulses independently of the normal PLC program scan cycle.&lt;/p&gt;

&lt;p&gt;Instead of relying entirely on the application program to detect every transition, the hardware counter registers pulses using dedicated counting circuitry.&lt;/p&gt;

&lt;p&gt;HSC functionality is particularly useful for:&lt;/p&gt;

&lt;p&gt;High-frequency flow meter outputs&lt;/p&gt;

&lt;p&gt;Encoder feedback&lt;/p&gt;

&lt;p&gt;Position measurement&lt;/p&gt;

&lt;p&gt;Speed monitoring&lt;/p&gt;

&lt;p&gt;High-speed production counters&lt;/p&gt;

&lt;p&gt;However, an HSC is not a universal solution. Its supported input frequency, voltage level, signal type and electrical configuration must match the flow meter output.&lt;/p&gt;

&lt;p&gt;Always check the PLC manufacturer's HSC specifications before selecting or wiring the input.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;Check Pulse Scaling Before Troubleshooting Hardware&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;Incorrect K-factor configuration is another frequent source of measurement errors.&lt;/p&gt;

&lt;p&gt;Imagine a meter configured for 500 pulses per cubic metre, while the PLC program uses 1,000 pulses per cubic metre.&lt;/p&gt;

&lt;p&gt;For an actual pulse count of 5,000:&lt;/p&gt;

&lt;p&gt;Using the correct K-factor:&lt;/p&gt;

&lt;p&gt;5,000 / 500 = 10 m³&lt;/p&gt;

&lt;p&gt;Using the incorrect K-factor:&lt;/p&gt;

&lt;p&gt;5,000 / 1,000 = 5 m³&lt;/p&gt;

&lt;p&gt;The PLC reports only half the actual volume.&lt;/p&gt;

&lt;p&gt;A practical configuration check should include:&lt;/p&gt;

&lt;p&gt;Confirm the meter's configured K-factor.&lt;/p&gt;

&lt;p&gt;Verify the engineering unit.&lt;/p&gt;

&lt;p&gt;Check the PLC scaling calculation.&lt;/p&gt;

&lt;p&gt;Confirm whether the pulse output represents actual or corrected volume.&lt;/p&gt;

&lt;p&gt;Compare the calculated total with an independent reference where possible.&lt;/p&gt;

&lt;p&gt;A correct pulse count with incorrect scaling still produces an incorrect measurement.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;Electrical Noise and False Pulse Counting&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;Electrical noise can cause a controller to detect transitions that were never generated by the flow meter.&lt;/p&gt;

&lt;p&gt;This can happen when pulse cables are installed near:&lt;/p&gt;

&lt;p&gt;Variable frequency drives&lt;/p&gt;

&lt;p&gt;Motor power cables&lt;/p&gt;

&lt;p&gt;High-voltage conductors&lt;/p&gt;

&lt;p&gt;Switching power supplies&lt;/p&gt;

&lt;p&gt;Contactors and other inductive loads&lt;/p&gt;

&lt;p&gt;In some installations, noise produces additional counts. In others, signal distortion causes missed pulses.&lt;/p&gt;

&lt;p&gt;Good wiring practices help reduce these problems:&lt;/p&gt;

&lt;p&gt;Use suitable shielded instrumentation cable.&lt;/p&gt;

&lt;p&gt;Route signal cables separately from power cables.&lt;/p&gt;

&lt;p&gt;Follow the manufacturer's grounding and shielding recommendations.&lt;/p&gt;

&lt;p&gt;Maintain proper cable termination.&lt;/p&gt;

&lt;p&gt;Use compatible signal conditioning where required.&lt;/p&gt;

&lt;p&gt;Verify the electrical characteristics of the pulse output and PLC input.&lt;/p&gt;

&lt;p&gt;Shield grounding arrangements should follow the equipment manufacturer's recommendations and the site's grounding design. A single-ended shield connection is common in some instrumentation installations, but it should not be treated as a universal rule.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;Understand Open-Collector and Voltage Pulse Outputs&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;Not every pulse output uses the same electrical arrangement.&lt;/p&gt;

&lt;p&gt;Common output types include:&lt;/p&gt;

&lt;p&gt;Open-collector output: Requires a compatible pull-up arrangement and correct input wiring. The PLC input and meter output must be electrically compatible.&lt;/p&gt;

&lt;p&gt;Voltage pulse output: Provides voltage transitions between defined electrical levels. The PLC input must support the signal voltage and switching characteristics.&lt;/p&gt;

&lt;p&gt;Relay pulse output: Uses a switching contact to generate pulses. Its maximum switching frequency and contact life must be considered.&lt;/p&gt;

&lt;p&gt;Before connecting the meter to a PLC, verify:&lt;/p&gt;

&lt;p&gt;Output voltage and current ratings&lt;/p&gt;

&lt;p&gt;NPN or PNP configuration, where applicable&lt;/p&gt;

&lt;p&gt;Pull-up or pull-down requirements&lt;/p&gt;

&lt;p&gt;Input module compatibility&lt;/p&gt;

&lt;p&gt;Maximum switching frequency&lt;/p&gt;

&lt;p&gt;Cable length and signal conditioning requirements&lt;/p&gt;

&lt;p&gt;Incorrect electrical interfacing can create intermittent counting problems that are difficult to identify through PLC programming alone.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;Calculate Flow Rate from Pulse Frequency&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;In addition to total volume, pulse frequency can be used to calculate instantaneous flow rate.&lt;/p&gt;

&lt;p&gt;Suppose:&lt;/p&gt;

&lt;p&gt;K-factor = 100 pulses per litre&lt;/p&gt;

&lt;p&gt;Measured frequency = 500 pulses per second&lt;/p&gt;

&lt;p&gt;The flow rate is:&lt;/p&gt;

&lt;p&gt;Flow rate = Frequency / K-factor&lt;/p&gt;

&lt;p&gt;Flow rate = 500 / 100&lt;/p&gt;

&lt;p&gt;Flow rate = 5 litres per second&lt;/p&gt;

&lt;p&gt;To convert into litres per minute:&lt;/p&gt;

&lt;p&gt;5 × 60 = 300 litres per minute&lt;/p&gt;

&lt;p&gt;The calculation is straightforward, but the implementation must account for signal stability, measurement intervals and low-flow conditions.&lt;/p&gt;

&lt;p&gt;A very short measurement window may produce unstable readings when the pulse frequency is low. A longer window improves averaging but can make the displayed flow rate slower to respond.&lt;/p&gt;

&lt;p&gt;The appropriate calculation interval depends on the process dynamics and required response time.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;A Practical Troubleshooting Checklist&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;When a pulse flow meter gives incorrect readings, investigate the measurement chain systematically.&lt;/p&gt;

&lt;p&gt;Symptom&lt;/p&gt;

&lt;p&gt;Possible cause&lt;/p&gt;

&lt;p&gt;What to check&lt;/p&gt;

&lt;p&gt;Missing pulses&lt;/p&gt;

&lt;p&gt;Input frequency limitation&lt;/p&gt;

&lt;p&gt;HSC and input specifications&lt;/p&gt;

&lt;p&gt;Extra pulses&lt;/p&gt;

&lt;p&gt;Electrical interference&lt;/p&gt;

&lt;p&gt;Cable routing and grounding&lt;/p&gt;

&lt;p&gt;Incorrect total&lt;/p&gt;

&lt;p&gt;Wrong K-factor&lt;/p&gt;

&lt;p&gt;Pulse scaling and units&lt;/p&gt;

&lt;p&gt;Unstable flow rate&lt;/p&gt;

&lt;p&gt;Short sampling interval&lt;/p&gt;

&lt;p&gt;Calculation window&lt;/p&gt;

&lt;p&gt;No pulses detected&lt;/p&gt;

&lt;p&gt;Wiring incompatibility&lt;/p&gt;

&lt;p&gt;Output and input electrical types&lt;/p&gt;

&lt;p&gt;Intermittent counting&lt;/p&gt;

&lt;p&gt;Loose connections&lt;/p&gt;

&lt;p&gt;Terminals and cable condition&lt;/p&gt;

&lt;p&gt;It is also useful to compare the meter's pulse output with the PLC's accumulated count during a controlled test. This helps identify whether the problem originates in the meter, wiring, input module or software calculation.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;Why Pulse Integrity Matters in Industrial Measurement&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;Pulse counting is often treated as a simple automation task, but it can become an important part of the overall measurement chain.&lt;/p&gt;

&lt;p&gt;In industrial applications, the reliability of the final measurement depends on the flow meter, electrical interface, signal processing, controller configuration and totalisation logic.&lt;/p&gt;

&lt;p&gt;For custody transfer applications, additional requirements apply. Measurement systems may require dedicated flow computers, defined calculation methods, calibration records and compliance with relevant industry standards.&lt;/p&gt;

&lt;p&gt;Engineers working on industrial measurement systems should therefore evaluate signal acquisition and totalisation as part of the complete system design.&lt;/p&gt;

&lt;p&gt;For further background on industrial measurement and metering system engineering, see Eximp Measurement Private Limited.&lt;/p&gt;

&lt;p&gt;Conclusion&lt;/p&gt;

&lt;p&gt;Pulse output flow meters offer a straightforward way to connect field measurement equipment with PLC-based automation systems. However, accurate counting depends on more than receiving a digital signal.&lt;/p&gt;

&lt;p&gt;The PLC input must support the pulse frequency, the electrical interface must be compatible, the K-factor must be correct and the signal must be protected against interference.&lt;/p&gt;

&lt;p&gt;When troubleshooting, start with the signal itself, verify the hardware configuration and then check the software calculation. This systematic approach helps engineers identify the actual source of measurement errors rather than changing PLC logic without understanding the problem.&lt;/p&gt;

</description>
      <category>automation</category>
      <category>hardware</category>
    </item>
    <item>
      <title>Hydrocarbon EPC Metering Skid Solutions: How to Prevent FAT Delays, Measurement Errors and CriticalPath Risks</title>
      <dc:creator>Eximp Measurement </dc:creator>
      <pubDate>Fri, 21 Aug 2026 04:29:34 +0000</pubDate>
      <link>https://dev.to/eximp_measurement/hydrocarbon-epc-metering-skid-solutions-how-to-prevent-fat-delays-measurement-errors-and-1imo</link>
      <guid>https://dev.to/eximp_measurement/hydrocarbon-epc-metering-skid-solutions-how-to-prevent-fat-delays-measurement-errors-and-1imo</guid>
      <description>&lt;p&gt;If you are an EPC contractor, PMC, engineering consultant, procurement manager or project engineer responsible for a hydrocarbon custody transfer metering skid, the biggest risk is rarely the price of the flow meter.&lt;/p&gt;

&lt;p&gt;The real risk is discovering—too late—that the metering package does not match the process conditions, the documentation is incomplete, the FAT cannot be cleared, the measurement uncertainty has not been demonstrated, or the skid cannot be commissioned without rework.&lt;/p&gt;

&lt;p&gt;That is where a relatively small package can become a major project problem.&lt;/p&gt;

&lt;p&gt;The solution?&lt;/p&gt;

&lt;p&gt;Engineer the complete metering system before fabrication—not just the flow meter.&lt;/p&gt;

&lt;p&gt;At Eximp Measurement Private Limited (EMPL), we approach custody transfer metering as a complete engineering and measurement solution covering application engineering, meter selection, skid design, instrumentation, measurement uncertainty, QA/QC, inspection, FAT, commissioning and lifecycle support.&lt;/p&gt;

&lt;p&gt;This article explains exactly how to derisk the package and what an EPC engineering team should expect from its meteringsystem supplier.&lt;/p&gt;

&lt;p&gt;Quick Answer: How Do You Prevent MeteringSkid Delays in a Hydrocarbon EPC Project?&lt;/p&gt;

&lt;p&gt;To prevent meteringskid delays, an EPC project should:&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;&lt;p&gt;Freeze process and measurement requirements before RFQ.&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Select the meter technology from actual process conditions—not a standard catalogue.&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Calculate the expected measurement uncertainty across the operating range.&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Define the complete meterrun and piping configuration.&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Establish the redundancy and maintenance philosophy.&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Freeze the QA/QC documentation index and ITP early.&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Agree on FAT procedures and acceptance criteria before fabrication.&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Verify calibration and traceability requirements.&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Integrate flow computers, instrumentation and SCADA requirements into the package.&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Select a meteringsystem integrator capable of engineering, fabrication, testing and commissioning.&lt;/p&gt;&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;The objective is simple: the skid should be technically approved, fully documented and FATready before the customer or TPI reaches the factory.&lt;/p&gt;

&lt;p&gt;Why a Small Metering Skid Can Become a CriticalPath EPC Package&lt;/p&gt;

&lt;p&gt;A custody transfer metering skid may be small compared with compressors, pressure vessels, pipelines or process plants.&lt;/p&gt;

&lt;p&gt;But its project interfaces are not small.&lt;/p&gt;

&lt;p&gt;A typical metering package may connect:&lt;/p&gt;

&lt;p&gt;Process → Piping → Metering → Instrumentation → Flow Computer → PLC/SCADA → QA/QC → TPI → FAT → Commissioning → Operations&lt;/p&gt;

&lt;p&gt;A problem at any interface can create rework.&lt;/p&gt;

&lt;p&gt;For example:&lt;/p&gt;

&lt;p&gt;Incorrect process data&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Wrong meter sizing&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Engineering revision&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Delayed drawings&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Delayed procurement&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Fabrication delay&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Incomplete documentation&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;FAT punch points&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Shipment/commissioning delay&lt;/p&gt;

&lt;p&gt;This is why the correct approach is not simply to purchase a flow meter.&lt;/p&gt;

&lt;p&gt;It is to manage the entire measurement package as an engineered system.&lt;/p&gt;

&lt;p&gt;The 7 Problems We Solve in Hydrocarbon Metering Projects&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; Wrong Flow Meter Selection&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;The problem&lt;/p&gt;

&lt;p&gt;A vendor may recommend a familiar flowmeter technology because it is already part of its standard product range.&lt;/p&gt;

&lt;p&gt;But the correct technology depends on the actual application.&lt;/p&gt;

&lt;p&gt;Engineering should consider:&lt;/p&gt;

&lt;p&gt;Minimum flow Normal flow Maximum flow Turndown Operating pressure Operating temperature Fluid composition Density Viscosity Gas/liquid characteristics Flow profile Installation conditions Required measurement uncertainty Maintenance philosophy&lt;/p&gt;

&lt;p&gt;Our solution&lt;/p&gt;

&lt;p&gt;At Eximp, the engineering process begins with the application, not with a predetermined meter.&lt;/p&gt;

&lt;p&gt;For gas applications, this may lead to an ultrasonic metering solution.&lt;/p&gt;

&lt;p&gt;For suitable differentialpressure applications, an orificebased system may be more appropriate.&lt;/p&gt;

&lt;p&gt;The engineering objective is to select the technology that satisfies the project's measurement, process, operational and commercial requirements.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; Metering Performance Is Promised but Not Demonstrated&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;The problem&lt;/p&gt;

&lt;p&gt;Many RFQs ask:&lt;/p&gt;

&lt;blockquote&gt;
&lt;p&gt;"What is the accuracy of the meter?"&lt;/p&gt;
&lt;/blockquote&gt;

&lt;p&gt;That is not enough for a custody transfer system.&lt;/p&gt;

&lt;p&gt;The EPC team needs to understand the expected performance of the complete measurement chain.&lt;/p&gt;

&lt;p&gt;That chain may include:&lt;/p&gt;

&lt;p&gt;Primary meter Pressure transmitter Temperature transmitter Flow computer Density/composition inputs Piping configuration Calibration Installation effects Operating conditions Calculation algorithms&lt;/p&gt;

&lt;p&gt;Our solution: Measurement Uncertainty Engineering&lt;/p&gt;

&lt;p&gt;Instead of relying only on a catalogue accuracy figure, require a projectspecific measurement uncertainty assessment.&lt;/p&gt;

&lt;p&gt;ISO 5168 provides methods for evaluating uncertainty in fluid flowrate or quantity measurement. ISO 5167 provides requirements for differentialpressure flow measurement systems. (&lt;a href="https://www.iso.org/standard/32199.html" rel="noopener noreferrer"&gt;ISO 5168&lt;/a&gt;)&lt;/p&gt;

&lt;p&gt;The engineering deliverable should show:&lt;/p&gt;

&lt;p&gt;What is the expected uncertainty? At what flow rate? Under which pressure and temperature conditions? What are the dominant uncertainty contributors? Does the system meet the project's contractual measurement requirement? That is a much stronger engineering qualification criterion than a single accuracy number.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; The Meter Run Is Designed Around the Meter Instead of the Process&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;A flow meter does not operate in isolation.&lt;/p&gt;

&lt;p&gt;Upstream and downstream piping, fittings, valves, disturbances and flow conditioning can affect measurement performance.&lt;/p&gt;

&lt;p&gt;This becomes particularly important for highaccuracy custody transfer applications.&lt;/p&gt;

&lt;p&gt;Our solution&lt;/p&gt;

&lt;p&gt;The metering skid should be engineered as a complete hydraulic and measurement system.&lt;/p&gt;

&lt;p&gt;The design review should consider:&lt;/p&gt;

&lt;p&gt;Meterrun geometry Straight lengths Flow conditioners, where required Upstream disturbances Valve configuration Filtration Pressure drop Drain and vent arrangement Maintenance access Instrument locations Isolation philosophy&lt;/p&gt;

&lt;p&gt;For differentialpressure systems, applicable ISO 5167 requirements must be incorporated into the design rather than added after piping is already finalized. (&lt;a href="https://www.iso.org/standard/79179.html" rel="noopener noreferrer"&gt;ISO 5167&lt;/a&gt;)&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; The Project Needs Continuous Operation but the Metering System Has No Proper Redundancy Strategy&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;For critical pipeline and process applications, taking the complete metering system offline for maintenance may not be acceptable.&lt;/p&gt;

&lt;p&gt;This is where a 2 × 100% dualstream metering configuration can be considered.&lt;/p&gt;

&lt;p&gt;How it works&lt;/p&gt;

&lt;p&gt;Normal operation:&lt;/p&gt;

&lt;p&gt;Stream A → Measuring&lt;/p&gt;

&lt;p&gt;Stream B → Standby / available&lt;/p&gt;

&lt;p&gt;During maintenance or approved verification:&lt;/p&gt;

&lt;p&gt;Stream A → Isolated&lt;/p&gt;

&lt;p&gt;Stream B → Measuring&lt;/p&gt;

&lt;p&gt;This can provide operational flexibility without automatically shutting down the entire transfer operation.&lt;/p&gt;

&lt;p&gt;But redundancy should not be specified simply because it sounds technically superior.&lt;/p&gt;

&lt;p&gt;Our solution&lt;/p&gt;

&lt;p&gt;We engineer the redundancy around:&lt;/p&gt;

&lt;p&gt;Required availability Flow range Maintenance philosophy Switching philosophy Measurement validation Control logic Flowcomputer configuration SCADA integration Project operating procedures&lt;/p&gt;

&lt;p&gt;The result should be availability with measurement integrity, not simply additional hardware.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; FAT Fails Because the Documentation Was Not Ready&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;This is one of the most common ways a technically good package becomes a schedule problem.&lt;/p&gt;

&lt;p&gt;The skid may be physically complete while the document dossier is still incomplete.&lt;/p&gt;

&lt;p&gt;Typical documentation may include:&lt;/p&gt;

&lt;p&gt;GA drawings P&amp;amp;IDs Instrument datasheets Meter datasheets Calculation documents Material certificates QAP ITP WPS/PQR/WPQ NDT reports Hydrotest reports Calibration certificates Instrument inspection records FAT procedure FAT reports Asbuilt drawings O&amp;amp;M manuals&lt;/p&gt;

&lt;p&gt;Our solution: DocumentationbyDesign&lt;/p&gt;

&lt;p&gt;Do not build the skid first and create the documentation afterward.&lt;/p&gt;

&lt;p&gt;Create the Document Requirement List (DRL) and Inspection &amp;amp; Test Plan (ITP) at the beginning.&lt;/p&gt;

&lt;p&gt;Then assign each document:&lt;/p&gt;

&lt;p&gt;Requirement → Responsibility → Review → Approval → Manufacturing Hold Point → FAT Evidence → Final Dossier&lt;/p&gt;

&lt;p&gt;This creates traceability from engineering requirement to final handover.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; FAT Becomes a Discovery Exercise&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;A FAT should not be the first time everyone discovers what the package is supposed to do.&lt;/p&gt;

&lt;p&gt;The problem&lt;/p&gt;

&lt;p&gt;FAT becomes difficult when:&lt;/p&gt;

&lt;p&gt;Drawings are not frozen. Instruments are not calibrated. PLC/flowcomputer logic is incomplete. Communication signals are not mapped. Test procedures are unclear. Acceptance criteria are ambiguous. Documentation is missing. Punch points are discovered during customer inspection.&lt;/p&gt;

&lt;p&gt;Our solution: FAT Readiness Engineering&lt;/p&gt;

&lt;p&gt;Before customer/TPI FAT, the supplier should complete an internal readiness review covering:&lt;/p&gt;

&lt;p&gt;Mechanical&lt;/p&gt;

&lt;p&gt;Dimensions Piping Valves Supports Identification Pressure testing&lt;/p&gt;

&lt;p&gt;Instrumentation&lt;/p&gt;

&lt;p&gt;Calibration Tagging Wiring Signal verification Instrument ranges&lt;/p&gt;

&lt;p&gt;Measurement&lt;/p&gt;

&lt;p&gt;Meter configuration Flowcomputer configuration Calculation logic Alarm limits Diagnostic parameters&lt;/p&gt;

&lt;p&gt;Control&lt;/p&gt;

&lt;p&gt;PLC logic Interlocks Alarms Communication SCADA signals&lt;/p&gt;

&lt;p&gt;Documentation&lt;/p&gt;

&lt;p&gt;Approved drawings Calibration certificates Test records Quality dossier FAT procedure&lt;/p&gt;

&lt;p&gt;The target is simple: arrive at FAT ready to demonstrate compliance—not ready to find problems.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; The Supplier Can Fabricate a Skid but Cannot Own the Measurement Problem&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;This is perhaps the most important vendorselection issue.&lt;/p&gt;

&lt;p&gt;There is a major difference between:&lt;/p&gt;

&lt;p&gt;Skid fabricator&lt;/p&gt;

&lt;p&gt;and&lt;/p&gt;

&lt;p&gt;Meteringsystem integrator&lt;/p&gt;

&lt;p&gt;A fabricator may be able to:&lt;/p&gt;

&lt;p&gt;Cut pipe Weld Assemble valves Mount instruments Paint Package equipment&lt;/p&gt;

&lt;p&gt;But custody transfer requires more.&lt;/p&gt;

&lt;p&gt;You need someone who can also understand:&lt;/p&gt;

&lt;p&gt;Meter technology Measurement uncertainty Flow calculations Meterrun design Calibration Flowcomputer configuration Meter diagnostics Applicable standards FAT Commissioning Measurement performance&lt;/p&gt;

&lt;p&gt;Our solution&lt;/p&gt;

&lt;p&gt;Eximp's engineering approach combines flow measurement technology with packagedsystem engineering.&lt;/p&gt;

&lt;p&gt;The company describes its capabilities around custodytransfer flow measurement systems, engineering, construction, commissioning and measurement services for oil and gas applications. ([Eximp Measurement]&lt;/p&gt;

&lt;p&gt;That is the capability EPC teams should look for when qualifying a metering vendor.&lt;/p&gt;

&lt;p&gt;What Should an EPC Company Put in Its Metering Skid RFQ?&lt;/p&gt;

&lt;p&gt;If you are preparing an RFQ for a custody transfer metering skid, do not send only:&lt;/p&gt;

&lt;blockquote&gt;
&lt;p&gt;"Supply 6inch ultrasonic metering skid."&lt;/p&gt;
&lt;/blockquote&gt;

&lt;p&gt;That leaves too much open to interpretation.&lt;/p&gt;

&lt;p&gt;Your RFQ should define the following.&lt;/p&gt;

&lt;p&gt;Process Information&lt;/p&gt;

&lt;p&gt;| Requirement | What the Vendor Needs | | | | | Fluid | Gas / liquid / hydrocarbon composition | | Minimum flow | Actual operating minimum | | Normal flow | Normal operating condition | | Maximum flow | Design maximum | | Pressure | Minimum / normal / maximum | | Temperature | Minimum / normal / maximum | | Density | Operating range | | Viscosity | Where applicable | | Turndown | Required operating range | | Line size | Process requirement | | Pressure class | Design requirement |&lt;/p&gt;

&lt;p&gt;MeteringSystem Requirements&lt;/p&gt;

&lt;p&gt;The RFQ should clearly define:&lt;/p&gt;

&lt;p&gt;Meter technology Number of streams 1 × 100% or 2 × 100% configuration Required measurement uncertainty Flowcomputer requirements Pressure measurement Temperature measurement Density/composition requirements Meter diagnostics Proving/verification philosophy Communication requirements SCADA interface Data logging&lt;/p&gt;

&lt;p&gt;Mechanical Package Requirements&lt;/p&gt;

&lt;p&gt;The supplier should define and engineer:&lt;/p&gt;

&lt;p&gt;Meter runs Piping Valves Filters Flow conditioners Drains Vents Supports Access Maintenance arrangement Pressure rating Material specification Flange requirements&lt;/p&gt;

&lt;p&gt;Quality and Inspection Requirements&lt;/p&gt;

&lt;p&gt;The RFQ should also specify:&lt;/p&gt;

&lt;p&gt;QAP ITP TPI Material traceability Welding requirements NDT Hydrotesting Calibration FAT Documentation Asbuilt requirements&lt;/p&gt;

&lt;p&gt;This prevents a major procurement mistake:&lt;/p&gt;

&lt;p&gt;assuming that "standard documentation" means the same thing to every supplier.&lt;/p&gt;

&lt;p&gt;Which Standards Should a Hydrocarbon Metering Skid Follow?&lt;/p&gt;

&lt;p&gt;There is no universal standards list that applies identically to every metering skid.&lt;/p&gt;

&lt;p&gt;The applicable requirements depend on the fluid, meter technology, service and contractual measurement requirements.&lt;/p&gt;

&lt;p&gt;Commonly relevant standards and industry references can include:&lt;/p&gt;

&lt;p&gt;ISO 5167&lt;/p&gt;

&lt;p&gt;Used for differentialpressure flow measurement, including devices such as orifice plates, nozzles and Venturi tubes. (&lt;a href="https://www.iso.org/standard/79179.html" rel="noopener noreferrer"&gt;ISO 5167&lt;/a&gt;)&lt;/p&gt;

&lt;p&gt;ISO 5168&lt;/p&gt;

&lt;p&gt;Provides methods for evaluating uncertainty in fluidflow measurement. (&lt;a href="https://www.iso.org/standard/32199.html" rel="noopener noreferrer"&gt;ISO 5168&lt;/a&gt;)&lt;/p&gt;

&lt;p&gt;API MPMS&lt;/p&gt;

&lt;p&gt;The API Manual of Petroleum Measurement Standards provides industry guidance for petroleum measurement, including relevant areas of metering and proving. (&lt;a href="https://www.api.org/productsandservices/standards" rel="noopener noreferrer"&gt;API&lt;/a&gt;)&lt;/p&gt;

&lt;p&gt;AGA Standards&lt;/p&gt;

&lt;p&gt;AGA publications are widely used for naturalgas measurement applications, with the applicable report depending on the measurement technology and service.&lt;/p&gt;

&lt;p&gt;ISO 9001&lt;/p&gt;

&lt;p&gt;Qualitymanagement requirements may apply to the supplier's organizational quality system, depending on the project specification and contractual requirements.&lt;/p&gt;

&lt;p&gt;Important: The vendor should provide a standards compliance matrix showing exactly which standard applies to which component or engineering activity.&lt;/p&gt;

&lt;p&gt;How Eximp Approaches a Complete Metering Solution&lt;/p&gt;

&lt;p&gt;When an EPC team approaches Eximp for a metering package, the objective is not simply to select a meter and fabricate a skid.&lt;/p&gt;

&lt;p&gt;The objective is to answer five engineering questions:&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; What does the process require?&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;We start with the operating envelope and application.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; Which measurement technology fits?&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;The technology is selected around the application and measurement requirement.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; What does the complete system need to achieve?&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;This includes meter performance, uncertainty, instrumentation, piping, control and diagnostics.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; How will the package be verified?&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;The project needs defined inspection, calibration, testing and FAT requirements.&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt; How will the system perform after commissioning?&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;Diagnostics, verification, service and lifecycle measurement support must be considered before handover.&lt;/p&gt;

&lt;p&gt;This is the difference between supplying equipment and engineering a measurement solution.&lt;/p&gt;

&lt;p&gt;Eximp Metering Solutions for Oil &amp;amp; Gas Applications&lt;/p&gt;

&lt;p&gt;Eximp Measurement provides engineering and packaged solutions for flow measurement applications across oil and gas projects.&lt;/p&gt;

&lt;p&gt;Its published capabilities include:&lt;/p&gt;

&lt;p&gt;Custody transfer metering systems Ultrasonic flow metering Orifice metering Flow measurement systems Metering skids Measurement engineering Commissioning Measurement services Calibration and verification support&lt;/p&gt;

&lt;p&gt;The company states that it works across upstream, midstream and downstream oilandgas applications.&lt;/p&gt;

&lt;p&gt;For a project engineer, the important question is not whether the supplier has every type of meter.&lt;/p&gt;

&lt;p&gt;The important question is:&lt;/p&gt;

&lt;blockquote&gt;
&lt;p&gt;Can the supplier take responsibility for the measurement package from process data through engineering, fabrication, FAT and commissioning?&lt;/p&gt;
&lt;/blockquote&gt;

&lt;p&gt;That is the capability that reduces EPC execution risk.&lt;/p&gt;

&lt;p&gt;What a Complete MeteringSkid Deliverable Should Look Like&lt;/p&gt;

&lt;p&gt;Before accepting a package, your project team should be able to trace:&lt;/p&gt;

&lt;p&gt;Process Requirement&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Meter Selection&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Sizing / Application Calculation&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Measurement Uncertainty&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;GA / P&amp;amp;ID&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Instrumentation&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Quality Plan&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Inspection&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Calibration&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;FAT&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;AsBuilt Documentation&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Commissioning&lt;/p&gt;

&lt;p&gt;↓&lt;/p&gt;

&lt;p&gt;Operational Verification&lt;/p&gt;

&lt;p&gt;If there is a gap between these stages, that gap is a potential project risk.&lt;/p&gt;

&lt;p&gt;A Practical VendorQualification Checklist&lt;/p&gt;

&lt;p&gt;Before awarding a hydrocarbon metering package, ask your shortlisted suppliers:&lt;/p&gt;

&lt;p&gt;Engineering&lt;/p&gt;

&lt;p&gt;Can you perform application engineering? Can you demonstrate meter sizing? Can you calculate measurement uncertainty? Can you engineer the complete meter run? Can you recommend technology based on process conditions?&lt;/p&gt;

&lt;p&gt;Quality&lt;/p&gt;

&lt;p&gt;Can you provide a projectspecific QAP and ITP? How do you control material traceability? How are welding and NDT records managed? How is the final documentation dossier compiled?&lt;/p&gt;

&lt;p&gt;Measurement&lt;/p&gt;

&lt;p&gt;How is calibration performed? What standards are used? How is traceability established? What diagnostic data is available? How is meter performance verified?&lt;/p&gt;

&lt;p&gt;FAT&lt;/p&gt;

&lt;p&gt;Who writes the FAT procedure? What are the acceptance criteria? Can the flow computer be demonstrated? Can SCADA interfaces be tested? How are punch points controlled?&lt;/p&gt;

&lt;p&gt;Project Execution&lt;/p&gt;

&lt;p&gt;Who is the engineering owner? Who is the project manager? Who controls procurement? Who supports TPI? Who attends commissioning?&lt;/p&gt;

&lt;p&gt;Lifecycle&lt;/p&gt;

&lt;p&gt;Who supports the system after commissioning? Are spare parts available? Is diagnostic support available? Can the supplier support future recalibration or verification?&lt;/p&gt;

&lt;p&gt;If a supplier cannot answer these questions clearly, the project team should investigate further before awarding the package.&lt;/p&gt;

&lt;p&gt;Why Eximp Is a Solution Partner for EPC Metering Projects&lt;/p&gt;

&lt;p&gt;A metering skid should not become the package everyone remembers because it delayed the project.&lt;/p&gt;

&lt;p&gt;The right engineering approach moves the difficult questions to the beginning.&lt;/p&gt;

&lt;p&gt;Eximp Measurement's role is to help solve those questions before fabrication:&lt;/p&gt;

&lt;p&gt;Process data → understand the application&lt;/p&gt;

&lt;p&gt;Technology selection → choose the appropriate measurement principle&lt;/p&gt;

&lt;p&gt;System engineering → design the complete metering package&lt;/p&gt;

&lt;p&gt;Uncertainty evaluation → quantify measurement performance&lt;/p&gt;

&lt;p&gt;QA/QC → control manufacturing and documentation&lt;/p&gt;

&lt;p&gt;Inspection → provide objective evidence&lt;/p&gt;

&lt;p&gt;FAT → demonstrate package functionality&lt;/p&gt;

&lt;p&gt;Commissioning → bring the system into operation&lt;/p&gt;

&lt;p&gt;Measurement support → maintain performance throughout the lifecycle&lt;/p&gt;

&lt;p&gt;That is the solution an EPC project actually needs.&lt;/p&gt;

&lt;p&gt;The Bottom Line for Project Engineers&lt;/p&gt;

&lt;p&gt;If your project is currently procuring a custody transfer metering skid, do not wait for FAT to discover engineering problems.&lt;/p&gt;

&lt;p&gt;Solve them during specification.&lt;/p&gt;

&lt;p&gt;Do not ask only:&lt;/p&gt;

&lt;p&gt;"Which meter should we buy?"&lt;/p&gt;

&lt;p&gt;Ask:&lt;/p&gt;

&lt;p&gt;"What complete measurement system will meet our process conditions, uncertainty requirement, inspection requirements and commissioning schedule?"&lt;/p&gt;

&lt;p&gt;Do not ask only:&lt;/p&gt;

&lt;p&gt;"What is the meter accuracy?"&lt;/p&gt;

&lt;p&gt;Ask:&lt;/p&gt;

&lt;p&gt;"What is the uncertainty of the complete measurement chain across our operating range?"&lt;/p&gt;

&lt;p&gt;Do not ask only:&lt;/p&gt;

&lt;p&gt;"Can you fabricate the skid?"&lt;/p&gt;

&lt;p&gt;Ask:&lt;/p&gt;

&lt;p&gt;"Can you engineer, document, test, commission and support the complete metering system?"&lt;/p&gt;

&lt;p&gt;That is how a small metering package stops being a criticalpath risk.&lt;/p&gt;

&lt;p&gt;And that is exactly where a specialist meteringsystem integrator can create value.&lt;/p&gt;

&lt;p&gt;Frequently Asked Questions&lt;/p&gt;

&lt;p&gt;What is the best flow meter for custody transfer in oil and gas?&lt;/p&gt;

&lt;p&gt;There is no single best flow meter for every custodytransfer application. The appropriate technology depends on fluid properties, flow range, pressure, temperature, turndown, installation conditions, required uncertainty, maintenance philosophy and applicable standards.&lt;/p&gt;

&lt;p&gt;For naturalgas applications, ultrasonic metering can be appropriate where the application and project requirements support it. Differentialpressure technologies such as orifice metering can also be appropriate for specific applications.&lt;/p&gt;

&lt;p&gt;The correct selection should be based on engineering calculations rather than a generic "best meter" claim.&lt;/p&gt;

&lt;p&gt;What is a custody transfer metering skid?&lt;/p&gt;

&lt;p&gt;A custody transfer metering skid is a complete engineered measurement package used to measure hydrocarbons during commercial transfer. It can integrate flow meters, piping, valves, pressure and temperature instruments, flow computers, control systems, diagnostics and associated measurement equipment.&lt;/p&gt;

&lt;p&gt;Why is measurement uncertainty important in custody transfer?&lt;/p&gt;

&lt;p&gt;Because the commercial quantity being transferred depends on the measurement system as a whole.&lt;/p&gt;

&lt;p&gt;A catalogue accuracy value for one instrument does not necessarily represent the uncertainty of the complete installed measurement system.&lt;/p&gt;

&lt;p&gt;A projectspecific uncertainty assessment identifies the major contributors and determines whether the measurement system meets the required performance.&lt;/p&gt;

&lt;p&gt;What is a 2 × 100% metering skid?&lt;/p&gt;

&lt;p&gt;A 2 × 100% metering skid contains two metering streams, each capable of handling the required operating flow independently.&lt;/p&gt;

&lt;p&gt;This architecture can allow one stream to remain operational while the other is isolated for maintenance or approved verification, subject to the project's operating philosophy.&lt;/p&gt;

&lt;p&gt;What documents should a meteringskid supplier provide?&lt;/p&gt;

&lt;p&gt;The exact list depends on the project, but commonly required documentation can include approved drawings, datasheets, calculations, QAP/ITP, material certificates, welding/NDT records, pressuretest records, calibration certificates, inspection reports, FAT records, asbuilt drawings and O&amp;amp;M manuals.&lt;/p&gt;

&lt;p&gt;How can I reduce FAT delays for a metering skid?&lt;/p&gt;

&lt;p&gt;Freeze the FAT procedure and acceptance criteria before fabrication, maintain a live documentation register, complete internal FAT readiness checks, verify instruments and control logic before customer inspection, and close internal punch points before the formal FAT.&lt;/p&gt;

&lt;p&gt;Can Eximp provide complete custody transfer metering skids?&lt;/p&gt;

&lt;p&gt;Eximp Measurement states that it provides complete flow measurement and custodytransfer solutions for oilandgas applications, including engineering, packaged metering systems and measurement services.&lt;/p&gt;

&lt;p&gt;Need a Custody Transfer Metering Solution for Your EPC Project?&lt;/p&gt;

&lt;p&gt;If you already have the process datasheet, RFQ, P&amp;amp;ID or metering specification, send it to the Eximp engineering team for a technical review.&lt;/p&gt;

&lt;p&gt;We can help you evaluate:&lt;/p&gt;

&lt;p&gt;Metering technology Meter sizing Flow range and turndown Meterrun configuration Measurement uncertainty Redundancy requirements Instrumentation Flow computer QA/QC requirements FAT requirements Documentation requirements Commissioning requirements&lt;/p&gt;

&lt;p&gt;Don't wait until FAT to find out your metering package has a problem.&lt;/p&gt;

&lt;p&gt;Talk to Eximp Measurement about your hydrocarbon metering requirement →&lt;/p&gt;

&lt;p&gt;Eximp Measurement Private Limited Pune, Maharashtra, India&lt;/p&gt;

&lt;p&gt;Custody Transfer Metering | Metering Skids | Ultrasonic Metering | Orifice Metering | Flow Measurement Systems | Measurement Engineering | Commissioning &amp;amp; Measurement Services&lt;/p&gt;

&lt;p&gt;Eximp Measurement&lt;/p&gt;

&lt;p&gt;Eximp Measurement Private Limited specializes in engineering and measurement solutions for oilandgas applications, including custodytransfer flow measurement systems, metering packages and associated measurement services.&lt;/p&gt;

&lt;p&gt;For technical or projectspecific requirements, engineering recommendations should be based on the project's approved process data, contractual measurement requirements and applicable standards.&lt;/p&gt;