<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <channel>
    <title>DEV Community: TypMax</title>
    <description>The latest articles on DEV Community by TypMax (typmax).</description>
    <link>https://dev.to/typmax</link>
    <image>
      <url>https://media2.dev.to/dynamic/image/width=90,height=90,fit=cover,gravity=auto,format=auto/https:%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Forganization%2Fprofile_image%2F16447%2Fea07676a-4285-429a-a692-39c76d8e622f.png</url>
      <title>DEV Community: TypMax</title>
      <link>https://dev.to/typmax</link>
    </image>
    <atom:link rel="self" type="application/rss+xml" href="https://dev.to/feed/typmax"/>
    <language>en</language>
    <item>
      <title>Walkaround vs shove: what really happens when a PCB router hits an obstacle</title>
      <dc:creator>Shubham Gupta</dc:creator>
      <pubDate>Wed, 25 Nov 2026 09:00:00 +0000</pubDate>
      <link>https://dev.to/typmax/walkaround-vs-shove-what-really-happens-when-a-pcb-router-hits-an-obstacle-3888</link>
      <guid>https://dev.to/typmax/walkaround-vs-shove-what-really-happens-when-a-pcb-router-hits-an-obstacle-3888</guid>
      <description>&lt;p&gt;Interactive PCB routing looks deceptively simple: move your cursor, and copper follows. But what happens when the path is blocked? The router has to decide whether to respect the copper already there, move it, or find another way. Those decisions say a lot about the algorithms running inside an EDA tool.&lt;/p&gt;

&lt;h2&gt;
  
  
  Four ways past an obstacle
&lt;/h2&gt;

&lt;p&gt;Picture the moment. You're dragging a track across the board and there's a via in the way. What happens next?&lt;/p&gt;

&lt;p&gt;Most interactive routers offer some mix of four strategies:&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;
&lt;strong&gt;Complain.&lt;/strong&gt; Draw the track and highlight the collision. You decide what to do about it.&lt;/li&gt;
&lt;li&gt;
&lt;strong&gt;Go around.&lt;/strong&gt; Bend the new track around existing copper. This is &lt;em&gt;walkaround&lt;/em&gt;.&lt;/li&gt;
&lt;li&gt;
&lt;strong&gt;Push.&lt;/strong&gt; Move the conflicting copper out of the way. This is &lt;em&gt;shove&lt;/em&gt;.&lt;/li&gt;
&lt;li&gt;
&lt;strong&gt;Dive.&lt;/strong&gt; Insert a via, change layers, and find another path.&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;&lt;a href="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fvmtnn2rof3bptexmotnd.png" class="article-body-image-wrapper"&gt;&lt;img src="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fvmtnn2rof3bptexmotnd.png" alt="Four ways a router can deal with a via in the way: complain, go around, push, or dive to the other layer" width="799" height="599"&gt;&lt;/a&gt;&lt;br&gt;
&lt;em&gt;Same start, same via, four answers&lt;/em&gt;&lt;/p&gt;

&lt;p&gt;These aren't four mutually exclusive modes. They're strategies a router combines while it completes a connection. KiCad calls the first three Highlight Collisions, Walk Around and Shove; Altium's comparable modes include Ignore, Walkaround and Push. Names and implementations vary between tools.&lt;/p&gt;

&lt;p&gt;The first three deal with obstacles on the current layer. The fourth changes the layer, and that opens a different set of questions.&lt;/p&gt;

&lt;h2&gt;
  
  
  1. Complain: highlight collisions
&lt;/h2&gt;

&lt;p&gt;This is drawing by hand with a referee. The track follows your cursor wherever you point it, and anything that breaks the clearance rules lights up.&lt;/p&gt;

&lt;p&gt;There's no path finding and no attempt to move anything. The editor checks your geometry against the copper nearby and reports conflicts. Whether you may commit a violation depends on the tool: KiCad only lets you with &lt;em&gt;Allow DRC violations&lt;/em&gt; switched on, and the design check still flags it later.&lt;/p&gt;

&lt;p&gt;It's cheap, instant and entirely yours. Use it for exact geometry: an odd angle, a tight pad entry, a one-millimetre fix. The trade-off is obvious. Every collision is yours to solve.&lt;/p&gt;

&lt;h2&gt;
  
  
  2. Go around: walkaround
&lt;/h2&gt;

&lt;p&gt;Walkaround respects what's already there. Existing tracks and vias stay put; only the new track bends.&lt;/p&gt;

&lt;h3&gt;
  
  
  The trick underneath: configuration space
&lt;/h3&gt;

&lt;p&gt;Routing a track that has width around obstacles is awkward. So turn it into an easier problem.&lt;/p&gt;

&lt;p&gt;Shrink the track to a zero-width centreline, and grow every obstacle to make up for it. In the simplest case each obstacle grows by&lt;/p&gt;

&lt;p&gt;r = c + w/2&lt;/p&gt;

&lt;p&gt;where &lt;em&gt;c&lt;/em&gt; is the required clearance and &lt;em&gt;w&lt;/em&gt; is the track width. If the centreline stays outside every grown shape, the real track keeps its clearance. A problem about a fat track has become a problem about a point.&lt;/p&gt;

&lt;p&gt;&lt;a href="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fkh6lpmh0ea79xnkrt0kf.png" class="article-body-image-wrapper"&gt;&lt;img src="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fkh6lpmh0ea79xnkrt0kf.png" alt="Growing each obstacle by the clearance plus half the track width lets the router treat the track as a zero-width line" width="800" height="335"&gt;&lt;/a&gt;&lt;br&gt;
&lt;em&gt;Grow the obstacle, shrink the track to a line&lt;/em&gt;&lt;/p&gt;

&lt;p&gt;Real editors do more than grow everything by one number. Clearance can depend on the object types, the nets, the net classes and the layer, so each pair of objects may need its own distance.&lt;/p&gt;

&lt;h3&gt;
  
  
  Finding the way round
&lt;/h3&gt;

&lt;p&gt;One useful way to picture a walkaround implementation is a &lt;em&gt;hull walk&lt;/em&gt;:&lt;/p&gt;

&lt;ol&gt;
&lt;li&gt;Find where the straight line to the cursor hits a grown obstacle (its &lt;em&gt;hull&lt;/em&gt;).&lt;/li&gt;
&lt;li&gt;Explore round its edge in both directions.&lt;/li&gt;
&lt;li&gt;Keep the candidate that reaches the cursor and best fits the router's preferences.&lt;/li&gt;
&lt;/ol&gt;

&lt;p&gt;&lt;a href="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fevd6rtsvmc32mwiibyi0.png" class="article-body-image-wrapper"&gt;&lt;img src="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fevd6rtsvmc32mwiibyi0.png" alt="Walkaround follows the hull both ways and keeps the shorter walk" width="799" height="306"&gt;&lt;/a&gt;&lt;br&gt;
&lt;em&gt;Two ways round, one kept&lt;/em&gt;&lt;/p&gt;

&lt;p&gt;The shorter route isn't automatically the winner. Corner count, preferred angles and the copper nearby can all tip the choice.&lt;/p&gt;

&lt;p&gt;And walkaround has a hard limit. When two hulls overlap, or leave a gap narrower than the track, that side is simply closed.&lt;/p&gt;

&lt;p&gt;Walkaround is polite. It never touches your work, and in a tight spot that's exactly its problem.&lt;/p&gt;

&lt;p&gt;It shines near finished or sensitive copper, like tuned lines or impedance-controlled nets. Expect longer, bendier routes.&lt;/p&gt;

&lt;h2&gt;
  
  
  3. Push: shove
&lt;/h2&gt;

&lt;p&gt;Shove asks a different question: why go around when you can make room?&lt;/p&gt;

&lt;p&gt;As the new track advances, the router displaces the copper in its way to open a legal corridor. The new track can stay straight. Pads, locked items and other fixed geometry limit how far anything can move. Some routers let you pull the cursor back and restore everything, so the whole operation feels reversible.&lt;/p&gt;

&lt;p&gt;The movement isn't the interesting part. What happens to everything &lt;em&gt;connected&lt;/em&gt; to the moved object is.&lt;/p&gt;

&lt;h3&gt;
  
  
  The cascade problem
&lt;/h3&gt;

&lt;p&gt;Picture the new track pushing a via. That via is joined to a track, and the track branches into two more segments.&lt;/p&gt;

&lt;p&gt;Moving the via can't mean sliding a circle across the board. Everything attached to it must stay attached and keep its clearance. If the moved track now hits a neighbour, the neighbour moves too. The push spreads outward.&lt;/p&gt;

&lt;p&gt;That chain is a &lt;em&gt;cascade&lt;/em&gt;.&lt;/p&gt;

&lt;p&gt;&lt;a href="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fry4jdad48fbaflumbf3x.png" class="article-body-image-wrapper"&gt;&lt;img src="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fry4jdad48fbaflumbf3x.png" alt="A shove cascade: the new track pushes a via, the via drags its track and branch, they push a neighbour, and a fixed pad stops the chain" width="800" height="398"&gt;&lt;/a&gt;&lt;br&gt;
&lt;em&gt;One push, three moves, stopped by a pad&lt;/em&gt;&lt;/p&gt;

&lt;p&gt;So a shove router is juggling much more than local collisions:&lt;/p&gt;

&lt;ul&gt;
&lt;li&gt;
&lt;strong&gt;Connectivity.&lt;/strong&gt; A moved segment must never leave the net broken or a junction dangling.&lt;/li&gt;
&lt;li&gt;
&lt;strong&gt;Clearance.&lt;/strong&gt; Every displaced object must stay legal against copper, pads, holes and the board edge.&lt;/li&gt;
&lt;li&gt;
&lt;strong&gt;Propagation.&lt;/strong&gt; One push can set off several more, and each needs its own checks.&lt;/li&gt;
&lt;li&gt;
&lt;strong&gt;Topology.&lt;/strong&gt; A route isn't a pile of loose segments. Its shape changes; its relationships mustn't.&lt;/li&gt;
&lt;li&gt;
&lt;strong&gt;Rollback.&lt;/strong&gt; If the push can't be completed, the previous legal geometry has to come back.&lt;/li&gt;
&lt;/ul&gt;

&lt;p&gt;It also needs limits. A cascade that keeps spreading makes the cursor slow and the result unpredictable. Routers cap how far a push may travel, stop at fixed geometry, or give up on the shove and try something else. Many tidy up afterwards, smoothing out corners the pushing left behind. The exact rules vary between tools.&lt;/p&gt;

&lt;p&gt;A small cursor movement can change copper you never touched.&lt;/p&gt;

&lt;p&gt;That's shove's power and its risk. Lock the nets you care about, and look at what moved after a big shove.&lt;/p&gt;

&lt;h2&gt;
  
  
  4. Dive: placing a via
&lt;/h2&gt;

&lt;p&gt;Sometimes the current layer has no path at all. Walking round fails, and pushing can't make enough room.&lt;/p&gt;

&lt;p&gt;So change layers: drop through a via, route on another layer, and come back up if the connection needs to.&lt;/p&gt;

&lt;p&gt;Interactively, you usually choose when and where. An automatic router has the harder job. It has to decide whether a layer change is worth it, and find a spot where the connection can actually be finished. That's three separate problems.&lt;/p&gt;

&lt;h3&gt;
  
  
  Candidate generation
&lt;/h3&gt;

&lt;p&gt;First, propose some places a via could go. A simple method samples positions around the pad along a few directions, such as the eight compass points, at a few distances. That's one design choice, not a standard; others search the free space geometrically.&lt;/p&gt;

&lt;h3&gt;
  
  
  Rule legality
&lt;/h3&gt;

&lt;p&gt;Next, throw out any candidate that breaks the design rules: via-to-pad and via-to-copper clearance, hole-to-hole and hole-to-copper clearance, board edge, keep-outs, and which via types and layers are allowed. Asking the rule checker first saves the router from wasting time on spots that could never be legal.&lt;/p&gt;

&lt;h3&gt;
  
  
  Route feasibility
&lt;/h3&gt;

&lt;p&gt;Here's the distinction that matters: &lt;strong&gt;a legal via is not a routable connection.&lt;/strong&gt;&lt;/p&gt;

&lt;p&gt;The track still has to escape the pad, reach the via, and then get to its destination on the other layer, which may be just as crowded.&lt;/p&gt;

&lt;p&gt;&lt;a href="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fthjoujjgfxpfwpoifl3v.png" class="article-body-image-wrapper"&gt;&lt;img src="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fthjoujjgfxpfwpoifl3v.png" alt="Three legal via spots around a pad; only one leads to a route that can continue on the other layer" width="800" height="401"&gt;&lt;/a&gt;&lt;br&gt;
&lt;em&gt;Three legal vias, one connection that works&lt;/em&gt;&lt;/p&gt;

&lt;h3&gt;
  
  
  Choosing between candidates
&lt;/h3&gt;

&lt;p&gt;A simple order of attack is: another shared layer with no via, then one via near either end, then two vias, one at each end. But rather than taking the first spot that passes, the router should score the ones that actually route. A typical cost is a weighted sum:&lt;/p&gt;

&lt;p&gt;cost = a × length + b × vias + c × bends + d × layer penalty&lt;/p&gt;

&lt;p&gt;The weights are design choices, not constants. Pick the cheapest feasible option within the search limits.&lt;/p&gt;

&lt;p&gt;Even that is a simplification. High-speed work adds its own demands: impedance, return-current continuity and via stub length. Differential pairs need symmetric vias and matched transitions, usually with ground vias nearby. Blind, buried and micro vias change which layer jumps are even possible.&lt;/p&gt;

&lt;p&gt;The goal isn't somewhere to put a via. It's a connection that works, electrically and physically.&lt;/p&gt;

&lt;h2&gt;
  
  
  What about the big "Route all" button?
&lt;/h2&gt;

&lt;p&gt;Everything so far has been one connection, one cursor, one obstacle. Batch autorouting changes the problem entirely.&lt;/p&gt;

&lt;p&gt;Imagine three unrouted connections and a wall with one narrow corridor through it. Only one track fits. Two of the nets could go round the end of the wall; one can't. If the router sends the wrong net through first, the net that truly needed the corridor is shut in.&lt;/p&gt;

&lt;p&gt;&lt;a href="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fvzdh3lmex8n30dvdvgz7.png" class="article-body-image-wrapper"&gt;&lt;img src="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fvzdh3lmex8n30dvdvgz7.png" alt="Routing order matters: if net 1 takes the one-track corridor, net 2 is shut in; route net 2 first and all three fit" width="800" height="436"&gt;&lt;/a&gt;&lt;br&gt;
&lt;em&gt;Same board, same nets, different order&lt;/em&gt;&lt;/p&gt;

&lt;p&gt;Now the software must decide which connection goes first, which paths to reserve, when to rethink earlier routes, and how to share congested space. Four classic ideas help.&lt;/p&gt;

&lt;p&gt;&lt;strong&gt;Lee maze routing (1961).&lt;/strong&gt; Lay a grid over the board and flood outward from the start, numbering each cell by its distance, until the flood reaches the target. Then trace back along falling numbers. It finds a path whenever the grid has one, and the shortest in grid steps, but on a big board it burns time and memory. (E. F. Moore described the same breadth-first idea for mazes in 1959.)&lt;/p&gt;

&lt;p&gt;&lt;strong&gt;A* (1968).&lt;/strong&gt; Same search, but selective. It expands the cell with the lowest cost so far &lt;em&gt;plus&lt;/em&gt; an estimate of the cost left. Give length, bends, vias and layer changes a price, and it heads for the target instead of flooding everywhere. As long as the estimate never overestimates, the route it returns is the cheapest under that cost model. Which isn't the same as electrically best.&lt;/p&gt;

&lt;p&gt;&lt;a href="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2F8shg3zbbmg3oq2kjyxbg.png" class="article-body-image-wrapper"&gt;&lt;img src="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2F8shg3zbbmg3oq2kjyxbg.png" alt="Same maze: Lee explores 62 cells, A star explores 21, and both find a shortest path" width="800" height="363"&gt;&lt;/a&gt;&lt;br&gt;
&lt;em&gt;Same grid, same path length: 62 cells searched vs 21&lt;/em&gt;&lt;/p&gt;

&lt;p&gt;&lt;strong&gt;Rip-up and reroute.&lt;/strong&gt; Sometimes an early decision is wrong. Pull up some routes already laid and try again in a different order. The negotiated-congestion variant, PathFinder, also makes contested areas more expensive on each pass, so nets learn to share instead of grabbing the first corridor they find.&lt;/p&gt;

&lt;p&gt;&lt;strong&gt;Topological routing.&lt;/strong&gt; Decide first only which side of each obstacle every route passes. Turn that plan into exact copper afterwards. It avoids the grid's staircase tracks and can look more natural, though the exact geometry still has to pass the rules.&lt;/p&gt;

&lt;p&gt;Real autorouters combine all of these. No single algorithm wins every board, and a fully routed board isn't necessarily a well-routed one.&lt;/p&gt;

&lt;p&gt;&lt;a href="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fwbyuqzeo2574ffgzc2hf.png" class="article-body-image-wrapper"&gt;&lt;img src="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fwbyuqzeo2574ffgzc2hf.png" alt="Every autorouter, ever: 100 percent routed, and the board to prove it" width="799" height="338"&gt;&lt;/a&gt;&lt;br&gt;
&lt;em&gt;We've all been here&lt;/em&gt;&lt;/p&gt;

&lt;h2&gt;
  
  
  Two more features: pairs and tuning
&lt;/h2&gt;

&lt;p&gt;Some routing adds constraints on top of walkaround and shove.&lt;/p&gt;

&lt;p&gt;&lt;strong&gt;Differential pairs.&lt;/strong&gt; The router has to keep two tracks in a relationship, not find two separate paths. It holds their width and spacing while controlling skew and uncoupled length. When an obstacle forces the pair apart, it has to bring them back together cleanly.&lt;/p&gt;

&lt;p&gt;&lt;strong&gt;Length tuning.&lt;/strong&gt; This adds deliberate detours, serpentines in KiCad, accordions and trombones in Altium, to hit a target length or delay. Matching the two halves of a pair and matching signals across a bus are different targets. Tune once placement and main routing are stable, because later changes can undo it. And equal length isn't good signal integrity on its own: impedance, coupling and the return path still matter.&lt;/p&gt;

&lt;h2&gt;
  
  
  So which strategy should you use?
&lt;/h2&gt;

&lt;p&gt;It depends on what you're willing to change.&lt;/p&gt;

&lt;div class="table-wrapper-paragraph"&gt;&lt;table&gt;
&lt;thead&gt;
&lt;tr&gt;
&lt;th&gt;If you want to…&lt;/th&gt;
&lt;th&gt;Strategy&lt;/th&gt;
&lt;th&gt;Trade-off&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;
&lt;td&gt;Place a track exactly where you point&lt;/td&gt;
&lt;td&gt;Highlight collisions&lt;/td&gt;
&lt;td&gt;You resolve every conflict yourself&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;Route near finished or sensitive copper&lt;/td&gt;
&lt;td&gt;Walkaround&lt;/td&gt;
&lt;td&gt;Longer, bendier paths&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;Get through a crowded area&lt;/td&gt;
&lt;td&gt;Shove&lt;/td&gt;
&lt;td&gt;Moves copper you didn't touch&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;Get past a layer with no path&lt;/td&gt;
&lt;td&gt;Via&lt;/td&gt;
&lt;td&gt;Board space, a drill hit, a signal discontinuity&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;Route a whole board in one go&lt;/td&gt;
&lt;td&gt;Batch autorouter&lt;/td&gt;
&lt;td&gt;Order and congestion decide the result&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;&lt;/div&gt;

&lt;p&gt;&lt;a href="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fe2belfag3331cmrjvr1t.png" class="article-body-image-wrapper"&gt;&lt;img src="https://media2.dev.to/dynamic/image/width=800%2Cheight=%2Cfit=scale-down%2Cgravity=auto%2Cformat=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fe2belfag3331cmrjvr1t.png" alt="A joke: walkaround politely weaves past every via, shove barges straight through and squashes everyone aside" width="800" height="334"&gt;&lt;/a&gt;&lt;br&gt;
&lt;em&gt;Know your router&lt;/em&gt;&lt;/p&gt;

&lt;p&gt;There's no universally best strategy. The interesting part is deciding what the router is allowed to change: the new track, the existing copper, or the layer you're on. That trade-off sits behind almost every routing decision you make.&lt;/p&gt;

&lt;h2&gt;
  
  
  Sources
&lt;/h2&gt;

&lt;ul&gt;
&lt;li&gt;C. Y. Lee, &lt;a href="https://doi.org/10.1109/TEC.1961.5219222" rel="noopener noreferrer"&gt;An Algorithm for Path Connections and Its Applications&lt;/a&gt;, 1961.&lt;/li&gt;
&lt;li&gt;P. Hart, N. Nilsson, B. Raphael, &lt;a href="https://doi.org/10.1109/TSSC.1968.300136" rel="noopener noreferrer"&gt;A Formal Basis for the Heuristic Determination of Minimum Cost Paths&lt;/a&gt;, 1968.&lt;/li&gt;
&lt;li&gt;L. McMurchie and C. Ebeling, &lt;a href="https://doi.org/10.1145/201310.201328" rel="noopener noreferrer"&gt;PathFinder: A Negotiation-Based Performance-Driven Router for FPGAs&lt;/a&gt;, 1995.&lt;/li&gt;
&lt;li&gt;T. Hama and H. Etoh, &lt;a href="https://doi.org/10.1109/43.743721" rel="noopener noreferrer"&gt;Topological Routing Path Search Algorithm with Incremental Routability Test&lt;/a&gt;, IEEE Transactions on CAD, 1999.&lt;/li&gt;
&lt;li&gt;
&lt;a href="https://docs.kicad.org/10.0/en/pcbnew/pcbnew.html" rel="noopener noreferrer"&gt;KiCad PCB Editor documentation&lt;/a&gt;: interactive router, tracks and vias.&lt;/li&gt;
&lt;li&gt;Altium Designer documentation: &lt;a href="https://www.altium.com/documentation/altium-designer/pcb/routing/interactive" rel="noopener noreferrer"&gt;Interactive Routing&lt;/a&gt; and &lt;a href="https://www.altium.com/documentation/altium-designer/pcb/high-speed-design/interactively-routing-differential-pairs" rel="noopener noreferrer"&gt;Differential Pair Routing&lt;/a&gt;.&lt;/li&gt;
&lt;/ul&gt;

&lt;p&gt;More posts: &lt;a href="https://typmax.com/blog/erc-clean-is-where-the-checks-start" rel="noopener noreferrer"&gt;ERC clean is where the checks start&lt;/a&gt;, or &lt;a href="https://typmax.com/blog/" rel="noopener noreferrer"&gt;all posts&lt;/a&gt;.&lt;/p&gt;

</description>
      <category>algorithms</category>
      <category>design</category>
      <category>software</category>
      <category>softwaredevelopment</category>
    </item>
  </channel>
</rss>
