Introduction
Simple Data Integrator (SDI) comes with a built-in scheduler feature.
With the scheduler, you can automatically execute mapping tasks at scheduled intervals.
You can configure the scheduler with various execution timings, such as:
- At a specific time every hour
- At a specific time daily
- At a specific time on specified days of the week
- At a specific time on specified days of the month
- At fixed time intervals (repeated execution)
File Trigger Support
In addition to time-based scheduling, file triggers are also supported.
File trigger means the task will be executed automatically when a file change is detected in a specified folder, such as:
🔹 When a new file is created
🔹 When an existing file is updated
🔹 When a file is deleted
This allows you to automatically start a task when a file arrives, making it ideal for batch jobs and integration with external systems.
How to Configure the Scheduler
Scenario
Here’s a scheduler setup example:
- Run Employee data integration every day at 1:00 AM.
- If the task fails, retry once after 5 minutes.
1. Click "New Scheduler" to open the scheduler settings screen.
2. Set Basic Scheduler Information
| No | Item | Description |
|---|---|---|
| 1 | Scheduler Name | Enter any unique name for easy management (no duplicate check enforced). |
| 2 | Frequency | Select Daily
|
| 3 | Period and Start Time | Set period: from today to 2099/12/31 Start time: 1:00:00 (HH:mm:ss format)For more on frequency settings, see this official doc |
| 4 | Active/Disable | Select Active
|
| 5 | Task Execution method | Select Parallel
|
| 6 | Retry | Select Yes Retry Count: 1 Retry Interval: 5 minutes
|
| 7 | Add Mapping Task | Open the mapping list and select your desired mapping |
3. Select Target Mapping
| No | Item | Description |
|---|---|---|
| 8 | Filter | Use keyword filter if you have many mappings |
| 9 | Select | Check the mappings to include in the schedule |
| 10 | Add | Click Add to include them as tasks to run |
4. Check the Schedule
Click the View Schedule button.
| No | Item | Description |
|---|---|---|
| 12 | Target Date | Select the date to view |
| 13 | Scheduled Tasks | Review the list of mapping tasks scheduled for that date |
5. Save
Click Save to register the scheduler settings.
Tip: Click Execute Scheduler if you want to test it manually before saving.
That’s it!





Top comments (0)