Asset Management: Maintenance Plans Not Creating Work Orders in Dynamics 365 Supply Chain Management

Applies to: Dynamics 365 Supply Chain Management, Asset management. Tested on version 10.0.46 (platform update 70) in the USMF demo company, September 2026.

CodeCore Dynamics LLC. 5 October 2026.


In Brief

  • A preventive maintenance plan in Dynamics 365 will only create work orders when 2 separate settings are both switched on. If either one is off, the plan will keep scheduling jobs without showing an error.
  • 1 of the 2 settings appears on screen under a different name from the one on the main Microsoft Learn page.
  • Our test run with both settings on removed 129 jobs waiting beyond the scheduling period and reset a service level that had been changed by hand.

The standard Dynamics 365 demo company has 62 maintenance jobs waiting without a work order, dated from 10 August 2019 onwards.

52 of them come from a weekly check on 2 emergency generators. The lines of that plan have Auto create cleared. The plan then keeps scheduling jobs but does not create work orders.

Microsoft Learn does not mention that a run with both settings on can also remove the waiting jobs beyond the scheduling period and reset values a planner has edited.

Open maintenance schedule lines showing 62 lines at status Created, none with a work order number

62 waiting jobs in the USMF demo company, none with a work order.

Cause

A maintenance plan does not create work orders itself. Schedule maintenance plans creates maintenance schedule lines, which Microsoft Learn calls work order proposals. The proposal will then only become a work order when both of these are on:

  • Auto create, a check box on each line of the maintenance plan;
  • Automatically create work order from schedule, a toggle in the scheduling dialog.

With only 1 of them on, the run will create schedule lines at status Created and no work orders (Schedule maintenance plans).

We scheduled the Extruder Line PM plan in USMF, 1 weekly job on 3 extruders, with the settings in each position:

Toggle on the run Auto create on the line Period Result
Yes Cleared 1 year 144 schedule lines at Created, no work orders
No Selected 1 year The same 144 lines, no work orders
Yes Selected 1 month 12 work orders, WO-000016 to WO-000027, 1 per job, 1 to 22 October
Yes Selected 2 months 12 work orders, WO-000029 to WO-000040, 1 per job, 5 to 26 November
No Cleared Not run

The first 2 runs produced the same screen.

144 Extruder Line Weekly PM schedule lines at status Created with no work order numbers

144 lines with no work orders, with the toggle on and the check box cleared.

The same 144 schedule lines after a run with Auto create selected, still without work orders

The same 144 lines with the check box selected and the toggle off.

Settings

The Schedule maintenance plans page on Learn lists the toggle as Auto create if specified in the line. In 10.0.46 the label reads Automatically create work order from schedule, the name used on another Learn page, Creating work orders. The label is cut short in the dialog. Hovering over it will show the full name.

Schedule maintenance plans dialog with the tooltip showing Automatically create work order from schedule

The toggle's full name appears in its tooltip.

You will find the dialog under Asset management > Periodic > Preventive maintenance > Schedule maintenance plans. It also opens from the maintenance schedule pages (Action Pane, Schedule group, Maintenance plan), where its title is Maintenance plan.

The same scheduling dialog opened from the maintenance schedule, titled Maintenance plan and filtered to 1 plan

The same dialog, titled Maintenance plan, limited to 1 plan through Records to include.

The Auto create check box sits on the plan's Lines FastTab (Asset management > Setup > Preventive maintenance > Maintenance plans), to the right of Interval type, Period and Plan date. It is also set separately on each line.

Maintenance plan line for Extruder Line Weekly PM with the Auto create check box cleared

Auto create is cleared on every plan in the USMF demo data.

Questions for Leaders

Ask your team Warning sign Why it matters
Do our maintenance plans create work orders automatically, or does someone convert them by hand? Nobody is sure If neither happens, planned maintenance will not reach the technicians
Is the list of open maintenance schedule lines growing while the work order list is not? Yes 1 of the 2 settings is off
Before automatic creation is switched on, have the waiting jobs and any changes to them been released or recorded? No A run with both settings on may remove them
How far ahead does the scheduling job create work orders? "A year", or nobody knows A long period may flood the technicians; a short one may remove waiting jobs

Checks

Check Where You should see If not
Where the waiting line comes from Reference type on Open maintenance schedule lines Maintenance plans Maintenance requests are not converted by any plan setting: see Other causes
Auto create Maintenance plans > your plan > Lines Selected Step 2
The toggle The scheduling dialog, or the recurring batch job's parameters Yes Steps 3 and 4
The plan is active Maintenance plans > your plan > Details > Active Yes See Other causes

Two forklift maintenance request lines at status Created on the open maintenance schedule

2 open lines from maintenance requests.

Fix

Before you start, you will need to be able to edit maintenance plans and run Schedule maintenance plans. If you can, try the steps in a test environment first.

1. Convert Waiting Jobs

Jobs already at Created can be converted without running the schedule again (Creating work orders).

  1. Go to Asset management > Maintenance schedule > Open maintenance schedule lines and select the jobs.
  2. On the Action Pane, select Work order.
  3. Choose One work order per line, or One work order per and set Yes against the fields to group by, such as Asset, Trade or Date.
  4. Select a Work order type and select OK.

Create work orders dialog with 3 schedule entries selected, grouped by date

3 jobs with 7.50 forecast hours, grouped by date.

We tested grouping by date only. The 3 extruder jobs due on 29 October then became 1 work order, WO-000028, with 3 lines. Grouping by date would suit a crew that services a whole line in 1 visit, while grouping by asset would suit 1 technician per machine.

All work orders list with WO-000028, 3 lines, Extruder Line Weekly PM

WO-000028, with 3 lines.

The extruder list on Open maintenance schedule lines went from 144 lines to 141 after the conversion.

Open maintenance schedule lines after conversion, 141 lines starting 5 November

141 lines left, starting on 5 November.

They stay on All maintenance schedule with the status Work order created and the work order number.

All maintenance schedule showing converted lines at Work order created, 3 of them linked to WO-000028

The 29 October lines, each showing WO-000028.

2. Auto Create

On the plan's Lines FastTab, select Auto create on every line that should produce work orders without review, and save. You may also set a Work order type on the line. If you leave it blank, the Preventive work order type in Asset management parameters will be used (Maintenance plans). The change applies from the next scheduling run. Lines that already exist stay as they are.

Maintenance plan line with Auto create selected and Work order type Preventive

Auto create selected, with work order type Preventive.

Asset management parameters showing the Preventive work order type set to Preventive

The default type for lines with no work order type.

3. Run the Schedule

In our test, this run removed the plan's waiting jobs beyond the period and reset an edited service level.

  1. Open Schedule maintenance plans.
  2. Set Period frequency and Period.
  3. Set Automatically create work order from schedule to Yes and choose the grouping.
  4. Under Records to include, set Maintenance plan to the plan you are fixing, and select OK.

Schedule maintenance plans dialog set to 2 months, automatic work order creation on, limited to EX-PM

The run with both settings on, set to 2 months and limited to EX-PM.

4. Batch Job

The toggle is saved with each scheduling run and is not stored on the plan. A recurring batch job saved with the toggle at No will then go on producing schedule lines without work orders.

To set one up, fill in the dialog as in step 3, set Batch processing to Yes on the Run in the background FastTab, select Recurrence, and select OK.

Schedule maintenance plans dialog set up as a recurring batch job with automatic work order creation grouped by asset

The dialog set up as a batch job, with the toggle on and grouping by asset.

An existing job will be under System administration > Inquiries > Batch jobs. Learn describes setting a job to Withhold to stop it running (Create a batch job). Change status is on the Action Pane in 10.0.46. To see the job's saved settings, open it by its Job ID, select its task under Batch tasks, and select Parameters. The View tasks button that Learn mentions does not appear on this page in 10.0.46.

Batch job details page showing the Batch tasks section with a Parameters button

Parameters, on the job's task, shows the saved settings.

Results

We made the run in step 3 on 30 September, when EX-PM had 141 jobs waiting from 5 November 2026 to September 2027. We had changed the service level on EX-101's 5 November job from 4 to 2 beforehand, using Edit on Open maintenance schedule lines.

Edit maintenance schedule dialog with the service level on 1 line changed to 2

Service level changed from 4 to 2 before the runs.

Runs with only 1 setting on kept all 144 lines and the edited value over the same year.

Maintenance schedule lines after a rerun with 1 setting on, the edited service level still in place

144 lines and service level 2 after a run with 1 setting on.

After the run:

  • 12 work orders, WO-000029 to WO-000040, had been created for the jobs from 5 to 26 November;
  • All maintenance schedule held no EX-PM line after 26 November;
  • Open maintenance schedule lines for EX-PM had fallen from 141 to 0;
  • the 5 November line for EX-101 and its work order, WO-000029, both showed service level 4.

All work orders showing 12 new preventive work orders for November

WO-000029 to WO-000040, with WO-000029 at service level 4.

All maintenance schedule for EX-PM ending on 26 November, every line with a work order

The EX-PM lines end on 26 November.

Open maintenance schedule lines for EX-PM with no rows

No open lines left for EX-PM.

We had run the plan twice on 25 September, first with the toggle only and then with both settings on. None of its 74 waiting jobs from 2019 and 2020 remained afterwards. Lines dated before the current date are not created again (Schedule maintenance plans). Those 74 jobs will therefore not return.

The 30 September run also used a shorter period than the run before it. Our tests do not show whether the removals came from the settings or from the period. We did not test whether later runs recreate the removed future jobs.

Period

Every job inside the period becomes a work order on the day of a run with both settings on. The number is roughly:

assets on the plan × occurrences of each plan line within the period

1 weekly line on 3 extruders gave 12 work orders for a month in the demo. A year on the same plan produced 144 schedule lines. All of them would have become work orders with both settings on.

The waiting jobs beyond the period were removed in our test. A longer period would keep more of them, but it would also create more work orders at once. How far ahead to create them would be a decision for your maintenance team. We would suggest a shorter period on a more frequent batch job for teams that work week to week, and a longer one for teams that plan labour and parts months ahead.

Other Causes

What you see Cause What to do
Lines with reference type Maintenance requests Created from maintenance requests, which no plan setting converts (Creating work orders) Convert them as in step 1
A counter line creates no lines No counter readings on the asset, or the counter type is not active on it (Maintenance plans) Register readings and activate the counter type
No lines for any line on the plan The plan's Active setting is No (same page) Set Active to Yes
Earlier dates missing Lines dated before the current date are not created (Schedule maintenance plans) Check All work orders for those dates
"Number sequence ... has been exceeded" when creating work orders The work order number sequence has reached the end of its range (troubleshooting article) Extend the range of the Work order sequence in Asset management parameters > Number sequences (AM_104 in USMF)
A job no longer comes back It was discarded; a discarded line will not appear again for that plan (Maintenance schedule) Use Delete for lines that should be recreated

Asset management parameters showing the Work order number sequence code AM_104

The Work order number sequence, AM_104 in USMF.

Testing

All runs used the USMF demo company on Dynamics 365 Supply Chain Management 10.0.46 (platform update 70), on 25, 28 and 30 September 2026. The test plan was Extruder Line PM (EX-PM): 1 weekly line, repeated from the plan date, with 3 extruders attached from 28 September 2026. Every run was limited to that plan through Records to include.

Date Toggle Auto create Period Result
25 Sep Yes, then Yes Cleared, then Selected 1 month WO-000016 to WO-000027 for 1 to 22 October; none of the 74 waiting jobs from 2019 and 2020 remained
28 Sep Yes Cleared 1 year 144 lines at Created from 29 October
28 Sep Yes Cleared 1 year Same 144 lines; edited service level kept
28 Sep No Selected 1 year Same 144 lines; edited service level kept
28 Sep Manual 3 jobs on 29 October grouped into WO-000028
30 Sep Yes Selected 2 months WO-000029 to WO-000040; 129 waiting jobs removed; service level 4

Lifecycle state log for WO-000016 showing it was created on 25 September 2026

WO-000016, created on 25 September.

Extruder Line PM plan with 3 extruders attached from 28 September 2026

The test plan, with 1 weekly line and 3 extruders.

Times on screen show 7:00 AM or 8:00 AM because the demo user's time zone is UTC. Both correspond to midnight US Pacific time, before and after daylight saving ends on 1 November. Learn states that time-based lines start at the beginning of the day (Maintenance plans).

Sources

On Method

This article was drafted with the help of Claude (Anthropic) from the author's captures in the demo environment and the Microsoft Learn pages listed above, and was checked and edited by the author.

About Author

Dean Fachrie is a Functional Analyst at CodeCore Dynamics LLC, working on Microsoft Dynamics 365 F&O architecture and enterprise system design.

Setting up preventive maintenance in Dynamics 365 Supply Chain Management, or finding planned jobs that never reach your technicians as work orders?