How Deep Should a Fence Post Go
A fence post fails from the ground up. Set it too shallow and wind tips it, the concrete collar cracks, water gets in, and the post rots at the ground line. Set it to the right depth, on a gravel base, in a hole of the right width, and it stays put for years. The numbers below come from the free calculator at https://fencepostdepthcalculator.com, and every figure was checked against the calculator site and the fence standards it draws on.

A post set too shallow leans and rots at the ground line.
The one third to one half rule
Builders use a simple rule of thumb. Bury one third to one half of the height of the fence above ground. A 6 foot fence needs a post buried 24 to 36 inches deep. A 4 foot fence needs 16 to 24 inches.
The calculator uses two versions of that rule. The standard version buries one third of the fence height, and the heavy duty version buries one half. It selects the heavy duty version once for exposed wind, loose ground, or a gate or special-load post.
Depth is measured from finished ground level to the bottom of the post. If the ground slopes, measure from the low side, where the post has the least cover. Frost, soft soil and height can all push the depth deeper than the rule of thumb.
The depth chart for 3 to 8 foot fences
Buried length is the part of the post below ground. Add 6 inches for the gravel base to get the hole depth.

Buried length by fence height, under the one third and one half rules.
| Fence height | Buried, one third | Buried, one half | Hole depth with 6 in base |
|---|---|---|---|
| 3 ft | 12 in | 18 in | 18 to 24 in |
| 4 ft | 16 in | 24 in | 22 to 30 in |
| 5 ft | 20 in | 30 in | 26 to 36 in |
| 6 ft | 24 in | 36 in | 30 to 42 in |
| 7 ft | 28 in | 42 in | 34 to 48 in |
| 8 ft | 32 in | 48 in | 38 to 54 in |
Is 2 feet deep enough? For a 4 foot fence, yes, at the heavy duty end. For a 6 foot fence, 24 inches is only enough where the soil is firm, the frost is shallow, and the fence is not exposed to strong wind. When in doubt, go deeper.
Frost can overrule everything
Frost is the reason posts heave. When wet soil freezes it expands and lifts whatever is sitting in it. A post that stops above the frost line gets lifted a little each winter and does not settle back.
The bottom of the post must reach the local frost depth. The calculator gives an extreme frost preset of 80 inches for the coldest places, and its worked example uses a 48 inch frost depth. A 6 foot fence in that example needs 24 inches by the standard rule and 36 inches by the heavy duty rule, but the frost depth is 48 inches, so the post must go to 48 inches, with a 54 inch hole on the 6 inch gravel base. Frost wins.

The post bottom must reach below the local frost depth, or frost lifts it each winter.
Inside the ASTM F537 wood fence method, the footing bottom is the deeper of the normal footing depth and the local frost depth plus 6 inches, and that extra 6 inches applies only inside that method. The calculator takes the greater of the structural depth and the frost reference, with no extra 6 inches.
Soil matters too. Sandy soil drains well and grips less. Clay holds water and heaves more. On the calculator, loose ground selects the heavier one half rule once, the same as exposed wind.
Post spacing and how many posts you need
Posts are usually spaced 6 to 8 feet apart, measured centre to centre. That is the distance from the middle of one post to the middle of the next, not the clear opening between them. For a 4 by 4 post, the clear opening at 6 foot centres is 68.5 inches. For a 6 by 6 post it is 66.5 inches, because the post is wider.

Spacing is measured centre to centre, not between the faces of the posts.
Closer spacing makes a stronger fence, and it matters most for tall fences and windy sites. Wider spacing saves posts and concrete, but the rails sag.
Count the posts before you buy. The number of posts is the run length divided by the spacing, rounded up, plus one for the end post. A 100 foot run at 8 foot spacing needs 13 sections and 14 posts, and at 6 foot spacing it needs 17 sections and 18 posts. Divide the run by the section count for the even centre spacing. For 100 feet at 8 foot spacing, 13 sections give centres of about 7 feet 8 inches, not 8 feet with a short bay left over.
A 48 foot run at 8 foot spacing gives 6 sections and 7 posts, and with two rails per section that is 12 rail positions. A 4 foot fence has 48 inches visible, so the buried length is 16 to 24 inches, and a 24 inch buried post on a 6 inch gravel base needs a 30 inch hole. Chain-link is different again. ASTM F567 section 4.1 uses 10 foot line spacing for chain-link fences.
Hole size and the gravel base
The calculator uses a 12 inch hole for a 4 by 4 post, which leaves about 4 inches of concrete on each side. A wider hole gives more grip, but it also uses more concrete and more digging.
The gravel base sits at the bottom of the hole, under the post, and the calculator uses a 6 inch base. Hole depth is buried length plus gravel base. A 24 inch buried post on a 6 inch base needs a 30 inch hole, and a 36 inch buried post needs a 42 inch hole. Measure the hole from finished ground level.

A 12 inch hole with a 6 inch gravel base under the post.
Watch the actual post size too. A US 4 by 4 is actually 3.5 inches square, or 88.9 mm, and a US 6 by 6 is 5.5 inches, or 139.7 mm. A 3.5 inch square post measures about 4.95 inches diagonally, so the hole must clear the diagonal, not just the flat side. A wider post also displaces more concrete. In a 12 inch hole with a 24 inch fill, a 3.5 inch post leaves 1.4007 cubic feet of concrete, while a 5.5 inch post leaves 1.1507, a difference of 0.25 cubic feet per hole.

A 4 by 4 post is actually 3.5 inches square, and a 6 by 6 is 5.5 inches.
Concrete, gravel and foam
Concrete gives the strongest hold. For a 12 inch hole with 24 inches of concrete fill and a 3.5 inch post, the volume is 1.4007 cubic feet. An 80 pound bag yields about 0.60 cubic feet, so one hole needs about 2.34 bags at the 3.5 inch post size, and about 1.92 bags at the 5.5 inch post size. Round up.

Check the post is plumb in two directions before the concrete sets.
The calculator covers 40, 50, 60 and 80 pound bags, with published yields of about 0.30, 0.375, 0.45 and 0.60 cubic feet. Check the declared yield of the mix you buy, because brands differ.
The same 100 foot run needs 14 posts and 14 holes. At 1.4007 cubic feet per hole, that is 19.61 cubic feet of concrete, or about 33 bags of 80 pound concrete. The gravel base is 0.3927 cubic feet per hole, or about 5.50 cubic feet for 14 holes. Buy ten percent extra on concrete and gravel, and one spare post.
Gravel setting is simple. Fill the hole with compacted gravel in layers, tamping each layer. The post can be pulled and reset if it moves, but it holds less well than concrete in soft soil or high wind.
Foam setting uses expanding polyurethane foam made for fence posts. It is light and fast, but it costs more than concrete and does not suit every soil. The calculator site gives no figures for foam, so this article gives none either. Follow the instructions on the product you buy.
Concrete sets in 20 to 40 minutes but does not reach full strength for days. Wait 4 hours before placing heavy objects on it, and do not hang a gate or pull on the fence until it has cured.
Step by step

Mark, dig, gravel, set, concrete, let it set.
- Mark the line. Run a string line between stakes at the two ends, mark each post position on it, and check the line is straight and the spacing is even.
- Dig the hole. Dig to the planned depth, buried length plus 6 inches for the gravel base. Keep the hole walls straight.
- Compact the gravel. Put 6 inches of gravel in the bottom and tamp it flat. Check the depth with a tape measure from ground level.
- Set the post. Stand the post on the gravel. Check it is plumb in two directions. Brace it with two diagonal braces screwed to stakes.
- Add the concrete. Pour it around the post in layers if the hole is deep, tamping each layer to remove air pockets. Slope the top away from the post so water runs off.
- Let it set. Leave the braces on for 20 to 40 minutes, and do not load the fence until the concrete has cured.
Setting all the posts first lets you check the line is straight before the rails go on.
Common mistakes

Five mistakes that cost the most to fix.
Setting the post too shallow is the most common mistake, and the hardest to fix. Digging it out costs more than digging deeper in the first place.
Skipping the gravel base is the second. The post end sits in wet soil and rots from the bottom, and the fence looks fine for a year, then the post snaps at the ground line.
Mixing the concrete too wet is the third. Wet concrete is easy to pour and weak when it sets, so follow the water ratio on the bag.
Setting the post out of plumb is the fourth. A post that leans a little at the bottom leans a lot at the top, so check it in two directions before the concrete sets.
Forgetting the utility check is the fifth, and the most dangerous. Call 811 in the United States, or your local utility marking service, before you dig.
This guide is a planning aid, not a substitute for local building rules or a structural design. Where a local rule differs, follow the local rule.
The full free guide is at https://fencepostdepthcalculator.com.