Who signs off on acceptance

Acceptance is usually written as a checklist, not as an owner. That is why the same integration passes review and still breaks in week one: the checklist has boxes, but no name next to the decision.

On a single-workflow build the sign-off question shows up as three different questions at once, and teams answer all of them with "the client".

  1. Who decides PASS/FAIL on a row?
  2. Who is allowed to accept a row with a known exception?
  3. Who accepts the cost when a fix is out of scope?

When one person answers all three, two predictable things happen. Every questionable row becomes PASS, because nobody wants to be the person who blocks a launch, and every scope argument restarts a week later, because the acceptance never said who could close it.

A workable split is boring and small. It looks like this in the acceptance sheet.

Column Who fills it Rule
Expected the person who wrote the requirement must be written before the run
Actual whoever executed the test only what the log shows
Verdict the reviewer, not the builder PASS / FAIL / PASS-WITH-EXCEPTION
Exception owner named at review, not later one person per exception

The rule that carries the table is on the last row. An exception without a name is not an exception, it is an open task, and open tasks do not belong in a sign-off document.

Failure modes I watch for:

  • The builder reviews their own rows. Fine for the first pass, not for the verdict column.
  • PASS-WITH-EXCEPTION used as a polite FAIL. If the exception list grows past a handful of rows, the workflow was not accepted, it was deferred.
  • No timestamp on the verdict. A sign-off without a time cannot answer "was this accepted before or after the fix?"

A short logging pattern keeps the verdict column honest:

{
  "case": "retry_after_503",
  "expected": {"crm_records": 2, "queue": 0},
  "actual": {"crm_records": 1, "queue": 1},
  "verdict": "PASS-WITH-EXCEPTION",
  "exception_owner": "ops-lead",
  "accepted_at": "2026-11-25T10:00:00+09:00"
}
Enter fullscreen mode Exit fullscreen mode

You do not need a tool to start this. A sheet with those five fields will already show you which rows have nobody behind them.

I write these posts as a vendor, and that is fine: copy the table above and use it on your current project without talking to me. If you need the run itself — the mock pipeline, the duplicate and 503 scenarios, the acceptance run — that is what the pilot is for.

Acceptance checklist and pilot scope: https://web.intelliliving.kr?utm_source=devto&utm_medium=organic&utm_campaign=b2b_obsidian&utm_content=dv_04

One question, one word: in your last integration, who signed the acceptance — builder, PM, or client? Put the word in the comments and I will write the next post around that role.