Acceptance is usually written as a checklist, not as an owner. That is why the same integration passes review and still breaks in week one: the checklist has boxes, but no name next to the decision.
On a single-workflow build the sign-off question shows up as three different questions at once, and teams answer all of them with "the client".
- Who decides PASS/FAIL on a row?
- Who is allowed to accept a row with a known exception?
- Who accepts the cost when a fix is out of scope?
When one person answers all three, two predictable things happen. Every questionable row becomes PASS, because nobody wants to be the person who blocks a launch, and every scope argument restarts a week later, because the acceptance never said who could close it.
A workable split is boring and small. It looks like this in the acceptance sheet.
| Column | Who fills it | Rule |
|---|---|---|
| Expected | the person who wrote the requirement | must be written before the run |
| Actual | whoever executed the test | only what the log shows |
| Verdict | the reviewer, not the builder | PASS / FAIL / PASS-WITH-EXCEPTION |
| Exception owner | named at review, not later | one person per exception |
The rule that carries the table is on the last row. An exception without a name is not an exception, it is an open task, and open tasks do not belong in a sign-off document.
Failure modes I watch for:
- The builder reviews their own rows. Fine for the first pass, not for the verdict column.
- PASS-WITH-EXCEPTION used as a polite FAIL. If the exception list grows past a handful of rows, the workflow was not accepted, it was deferred.
- No timestamp on the verdict. A sign-off without a time cannot answer "was this accepted before or after the fix?"
A short logging pattern keeps the verdict column honest:
{
"case": "retry_after_503",
"expected": {"crm_records": 2, "queue": 0},
"actual": {"crm_records": 1, "queue": 1},
"verdict": "PASS-WITH-EXCEPTION",
"exception_owner": "ops-lead",
"accepted_at": "2026-11-25T10:00:00+09:00"
}
You do not need a tool to start this. A sheet with those five fields will already show you which rows have nobody behind them.
I write these posts as a vendor, and that is fine: copy the table above and use it on your current project without talking to me. If you need the run itself — the mock pipeline, the duplicate and 503 scenarios, the acceptance run — that is what the pilot is for.
Acceptance checklist and pilot scope: https://web.intelliliving.kr?utm_source=devto&utm_medium=organic&utm_campaign=b2b_obsidian&utm_content=dv_04
One question, one word: in your last integration, who signed the acceptance — builder, PM, or client? Put the word in the comments and I will write the next post around that role.