Three acronyms cause more confusion in CDS pre-lodgement than almost anything else: GVMS, GMR and PBN. Each belongs to a different part of the process, and mixing them up is a common source of delay.
GVMS: the port system
The Goods Vehicle Movement Service is how many UK RoRo ports operate instead of an inventory system. At these ports, pre-lodgement is not optional, it is simply how the process works.
GMR: what the MRN becomes
Once a pre-lodged declaration is submitted at a GVMS port, its MRN needs to be combined into a Goods Movement Reference before the vehicle boards. Without a valid GMR, the driver cannot check in.
PBN: the Ireland equivalent
If the goods travel by RoRo into Ireland, GVMS does not apply. Irish Revenue instead uses a Pre-Boarding Notification, which links declarations before the ferry departs. This CDS pre-lodgement at UK RoRo ports breakdown sets out how the GB and Ireland routes differ in full.
Keeping the three apart
The simplest way to avoid errors is to treat GVMS and GMR as the GB pairing, and PBN as its own separate process for Ireland, rather than variations of the same thing.
Top comments (0)