DEV Community

nanocodes
nanocodes

Posted on

What is a reorder point, and how do you calculate it?

Running out of your best-selling product is expensive. The customer leaves, buys from a competitor and may not come back. Ordering too much is just as bad, because it ties up cash in stock that sits on a shelf. The reorder point is a simple number that helps you avoid both problems.

What is a reorder point?

The reorder point is the stock level at which you should place a new order, so that new stock arrives before the old stock runs out.

The formula

Reorder point = (average daily sales x lead time in days) + safety stock

  • Average daily sales: how many units you sell on a normal day.
  • Lead time: the number of days between placing an order and having the goods in your shop.
  • Safety stock: extra units kept for busy days, late deliveries or mistakes.

A worked example

You sell about 12 units of a product each day. Your supplier takes 5 days to deliver. You decide to keep 20 units as a buffer.

  • Demand during lead time = 12 x 5 = 60 units
  • Add safety stock = 60 + 20 = 80 units

When your stock falls to 80, you reorder. While you wait for the delivery you will sell about 60 units, and the 20 extra units protect you if the supplier is late or sales jump.

How to find each number

Average daily sales. Add up the units you sold over the last 30 days and divide by 30. Use a normal period, not a holiday week, and update it every few months.

Lead time. Use the real delivery time, not the promised one. Check your last five orders and use the longest typical figure.

Safety stock. There is no single correct number. A simple approach is to take the extra days you might wait in a bad case and multiply by your daily sales. If the supplier is sometimes 2 days late and you sell 12 a day, a buffer of 24 is reasonable.

When the reorder point changes

  • Seasonal demand: raise it before busy periods and lower it afterward.
  • New suppliers: recalculate with their lead time.
  • Price changes: if a supplier increases prices, you might order less often but in bigger quantities. Check what that does to cash flow.

Common mistakes

  1. Using last year's sales figure when demand has changed.
  2. Trusting the supplier's promised delivery time instead of the real one.
  3. Using the same safety stock for every product, including slow ones.
  4. Never rechecking the number after the first calculation.
  5. Having a number but no way to notice when stock reaches it.

Do it for your top products first

You do not need a reorder point for every item. Start with the 10 to 20 products that bring in most of your sales, then add more later.

Try it

Our free reorder point calculator lets you test your own numbers in seconds.

The last problem is noticing in time. SaleTick can send low-stock alerts, so you find out before an item runs out and not after.

Disclosure: I work on SaleTick.

Top comments (0)