Originally published on the Djangix blog. This is a condensed version — the full article is linked at the end.
Building a SaaS product is less a single build than a sequence of decisions. Doing them in the wrong order is what makes projects expensive, according to the original article.
The sequence, summarised
- Validate the problem first. Talk to the people who would pay, and confirm the pain is frequent and costly enough to justify software.
- Define the smallest useful version. Separate the core workflow that must work on day one from everything that can wait.
- Design around the workflow, not features. Map the main user journey end to end before screens multiply.
- Choose boring, proven foundations. Accounts, payments and data separation are not places to experiment.
- Build in visible slices. Working software shown regularly beats a long silent build with a big reveal.
- Prepare for launch as its own step. Billing checks, backups, monitoring and a support path need attention before users arrive, not after.
- Plan the post-launch loop. Early feedback, fixes and small improvements are part of development, not a separate phase.
The recurring theme: each stage reduces the risk of the next, and skipping early stages simply moves their cost later, with interest.
Read the full article on Djangix: SaaS Product Development: From Idea to Launch, Step by Step — with the complete step-by-step process and what happens at each stage.
Top comments (0)