DEV Community

DAQ-IOT
DAQ-IOT

Posted on

PV power station Monitoring IEC104 Dispatch Integrated Automation NSC320-SK Communication Management Device Front end Inverte...

https://zhuanlan.zhihu.com/p/1992230594944472855
As a professional provider of IoT data acquisition solutions and an expert in industrial IoT data acquisition, the editor of Shanghai Data Acquisition IOT Technology Co., Ltd, (daq-iot) hereby presents the following introduction, and sincerely welcomes discussions and exchanges.
Supported Communication Interfaces: CAN, RS485, Mbus, 4–20mA, Profibus, CC-Link, HART, digital I/O, etc.
Industrial Protocols: Modbus RTU/TCP, HJ212, IEC104, DLT645, DLMS, IEC61850, MQTT, etc.
Mail:export@daq-iot.com
图片
| | | | | | | | |
| --- | --- | --- | --- | --- | --- | --- | --- |
| | Cabinet name | device name | IP | iedname | communication protocol | A network port | Logical nodes (hanging devices) |
| one period | 10kV Huafu 01 switchgear | NSR612RF-DLine protection measurement and control device | 198.120.0.11 | NSR11 | 61850 | 102 | Front end unit B: IP-198.120.0.201 |
| 10kV#01 Collector circuit cabinet | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.12 | NSR12 |
| 10kV#01 SVG switchgear | NSR621RF-D Line Protection Measurement and Control Device | 198.120.0.13 | NSR13 |
| Phase II | 10kV Huafu 02 switchgear | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.21 | NSR21 | Front end unit C: IP-198.120.0.202 |
| 10kV # 02 collection power line cabinet | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.22 | NSR22 |
| 10kV # 02 SVG switchgear | NSR621RF-D Line Protection Measurement and Control Device | 198.120.0.23 | NSR23 |
| 1. Phase 2 | System protection cabinet -1n anti islanding | NSR659RF-DAnti islanding device | 198.120.0.14 | NSR14 | Front end unit B: IP-198.120.0.201 |
| System protection cabinet -2n fault disconnection | NSR658RF-D anti islanding device | 198.120.0.15 | NSR15 |
| System protection cabinet -3n anti islanding | NSR659RF-D anti islanding device | 198.120.0.16 | NSR16 |
| System protection cabinet -4n fault disconnection | NSR658RF-D anti islanding device | 198.120.0.17 | NSR17 |
| System Protection Cabinet - Power Quality I | PMC680M_V41Power quality device | 198.120.0.18 | NSR18 |
| Public Measurement and Control Cabinet - Comprehensive Measurement and Control 1 | NSR685 comprehensive measurement and control device | 198.120.0.19 | NSR19 | 103 | 2420 |
| three phases | 10kV#03 PV access cabinet | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.30 | NSR30 | 61850 | 102 | Front end unit E: IP-198.120.0.207 |
| 10kV Huafu 03 switchgear | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.31 | NSR31 |
| 10kV # 03 electrical wiring cabinet | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.32 | NSR32 |
| 10kV # 03 SVG switchgear | NSR621RF-D Line Protection Measurement and Control Device | 198.120.0.33 | NSR33 | Front end unit F: IP-198.120.0.208 |
| Phase 4 | 10kV # 03 PV access cabinet | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.40 | NSR34 |
| 10kV Huafu 04 switchgear | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.41 | NSR41 |
| 10kV # 04 collection power line cabinet | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.42 | NSR42 | Front end unit E: IP-198.120.0.207 |
| 10kV # 04 SVG switchgear | NSR621RF-D Line Protection Measurement and Control Device | 198.120.0.43 | NSR43 |
| 3. 4 periods | System protection cabinet -1n anti islanding II | NSR659RF-D anti islanding device | 198.120.0.34 | NSR34 |
| System protection cabinet -2n fault disconnection 2 | NSR658RF-D anti islanding device | 198.120.0.35 | NSR35 |
| System protection cabinet -3n anti islanding II | NSR659RF-D anti islanding device | 198.120.0.36 | NSR36 |
| System protection cabinet -4n fault disconnection 2 | NSR658RF-D anti islanding device | 198.120.0.37 | NSR37 |
| System Protection Cabinet - Power Quality II | PMC680M-V41 Power Quality Device | 198.120.0.38 | NSR38 |
| Public Measurement and Control Cabinet - Comprehensive Measurement and Control II | NSR685 comprehensive measurement and control device | 198.120.0.39 | NSR39 | 103 | 2420 |
| Phase Five | 10kV # 03 PV access cabinet | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.50 | NSR50 | 61850 | 102 | Front end unit G: IP-198.120.0.209 |
| 10kV Huafu 01 switchgear | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.51 | NSR51 |
| 10kV # 01 collection power line cabinet | NSR612RF-D Line Protection Measurement and Control Device | 198.120.0.52 | NSR52 |
| 10kV # 01 SVG switchgear | NSR621RF-D Line Protection Measurement and Control Device | 198.120.0.53 | NSR53 |
| System protection cabinet -1n anti islanding three | NSR659RF-D anti islanding device | 198.120.0.54 | NSR54 |
| System protection cabinet -2n fault disconnection three | NSR658RF-D anti islanding device | 198.120.0.55 | NSR55 |
| System Protection Cabinet - Power Quality III | PMC680M-V41 Power Quality Device | 198.120.0.56 | NSR56 |
| Public measurement and control cabinet - comprehensive measurement and control three | NSR685 comprehensive measurement and control device | 198.120.0.57 | NSR57 | 103 | 2420 |
| | | | | | | | |
| --- | --- | --- | --- | --- | --- | --- | --- |
| | | | Inside the factory stationNSC320-SK Communication Management DeviceIP Configuration | | | | |
| | | Dedicated network port for booster station equipment | Special network port for data acquisition of measurement and control inverters for external factory box transformers | Send the dedicated network port for centralized control | Send dispatch dedicated network port |
| 1. Phase 2 | Front end unit A | 198.120.0.204 | | | |
| Front end unit B | 198.120.0.201 Network card port 1 | 192.168.3.1 Network card 2 ports | | 192.168.3.210 network card with 3 ports |
| Front end unit C | 198.120.0.202 Network card port 1 | 192.168.3.2 Network card 2 ports | | 192.168.3.218 network card with 3 ports |
| 3. 4 periods | Front end unit D | 198.120.0.205 Network card port 1 | | | |
| Front end unit E | 198.120.0.207 Network card port 1 | 192.168.3.3 Network card 2 ports | | 192.168.3.234 network card with 3 ports |
| Front end unit F | 198.120.0.208 Network card port 1 | 192.168.4.4 Network card 2 ports | | 192.168.4.2 Network card with 3 ports |
| 5 issues | Front end unit G | 198.120.0.209 Network card port 1 | 192.168.4.5 Network card 2 ports | | 192.168.4.10 Network card with 3 ports |
| Remote Motor A | 198.120.0.210 Network card 1 port | | | |
| Remote Motor B | 198.120.0.211 Network Card 1 Port | | 10.18.31.105 Network card with 3 ports | |
| | | | | | |
| --- | --- | --- | --- | --- | --- |
| Scheduling given information | | | | | |
| Terminal IP address | 192.168.3.210 | 192.168.3.218 | 192.168.3.234 | 192.168.4.2 | 192.168.4.10 |
| subnet mask | 255.255.255.248 | 255.255.255.248 | 255.255.255.248 | 255.255.255.248 | 255.255.255.248 |
| Gateway | 192.168.3.209 | 192.168.3.217 | 192.168.3.233 | 192.168.4.1 | 192.168.4.9 |
| Vertical encryption | 192.168.3.214 | 192.168.3.222 | 192.168.3.238 | 192.168.4.6 | 192.168.4.14 |
| | | | | | |
| communication method | PV system | PV system | PV system | PV system | PV system |
| RTU address | 181 | 182 | 184 | 187 | 188 |
| Main station IP address one | 192.168.200.1 | 192.168.200.1 | 192.168.200.1 | 192.168.200.1 | 192.168.200.1 |
| Main station IP address 2 | 192.168.200.2 | 192.168.200.2 | 192.168.200.2 | 192.168.200.2 | 192.168.200.2 |
| | | | | | |
| communication method | 5200 | 5200 | 5200 | 5200 | 5200 |
| RTU address | 181 | 182 | 184 | 187 | 188 |
| Main station IP address one | 192.168.230.1 | 192.168.230.1 | 192.168.230.1 | 192.168.230.1 | 192.168.230.1 |
| Main station IP address 2 | 192.168.230.2 | 192.168.230.2 | 192.168.230.2 | 192.168.230.2 | 192.168.230.2 |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| Information on dispatching devices sent by the factory station |
| Phase I delivery scheduling device | Front end unit B | NSC320-SK Communication Management Device | Device Port 1-IP 198.120.0.201 | Device Port 3-IP 192.168.3.210 | Device Port 3-IP Gateway 192.168.3.209 |
| Phase II dispatching device | Front end unit C | NSC320-SK Communication Management Device | Device Port 1-IP 198.120.0.202 | Device Port 3-IP 192.168.3.218 | Device Port 3-IPGateway192.168.3.217 |
| Three phase delivery scheduling device | Front end unit E | NSC320-SK Communication Management Device | Device Port 1-IP 198.120.0.207 | Device Port 3-IP 192.168.3.234 | Device Port 3-IPGateway192.168.3.233 |
| Fourth phase dispatch device | Front end unit F | NSC320-SK Communication Management Device | Device Port 1-IP 198.120.0.208 | Device Port 3-IP 192.168.4.2 | Device Port 3-IPGateway192.168.4.1 |
| Fifth phase dispatch device | Front end unit G | NSC320-SK Communication Management Device | Device Port 1-IP 198.120.0.208 | Device Port 3-IP 192.168.4.10 | Device Port 3-IPGateway192.168.4.9 |

Top comments (0)