Two late-October GeM signals from Indian heavy industry show the same split every spare-parts planner eventually hits. One lot is locked to the original equipment maker or its designated OES. The other names a model and leaves the door open to any supplier who can prove fit and compound. Knowing which kind of RFQ you are writing — and which kind you are reading — saves weeks of dead bidding.
What an OEM/OES lock actually means
Steel Authority of India’s Bhilai Steel Plant (SMS-III) published a GeM buy for proprietary heat-exchanger plates and gaskets (GEM/2026/B/8119149; corrigendum extended the deadline into early November). Aggregator notices make the participation rule plain: only the named OEM or its OES, with back-up quality guarantees, may bid. That is a legitimate installed-base strategy when a plant wants one contractual throat to choke. It is also a closed door for every independent plate press.
Do not treat that lot as a sales target. Use it as evidence that Indian steel SMS cooling fleets still burn through plates and gaskets at volume — and as a reminder to write your own spare RFQs differently if you want competition.
The open-model contrast: AK-20 at DVC Mejia
Damodar Valley Corporation’s Mejia Thermal Power Station is buying 944 channel-plate gaskets plus gasket cement for PHE model AK-20 (GEM/2026/B/8161128), with bids due around 5 November 2026. The model string is on the face of the tender. That is the shape buyers should prefer when second-source stock or price pressure matters.
Public summaries: Bhilai plate/gasket lot and Mejia AK-20 gaskets.
Checklist before you lock a GeM (or private) RFQ
- Name the model, not only an OEM part number. AK-20-style strings travel across suppliers; proprietary PN-only lots often do not.
- Photograph the nameplate and one channel plate (both faces) before the pack comes apart. Stamp thickness and material beat guesswork.
- State compound and fixing. NBR, EPDM, FKM/Viton; clip-on, slit-in, or glued. Cement as a separate line item if your craft fits gaskets on site.
- Separate OEM/OES-locked lots from open-model lots in the bid documents so evaluators do not mix scoring rules.
- Ask for dimensional interchangeability in the existing frame, material certificates, and first-article photos — not a promise to “match the OEM PN.”
- Add a non-affiliation / compatible disclaimer so legal and stores stay aligned.
Independent suppliers can still help on open-model work: quote the pack, ship trial plates, and stock critical compounds before the next outage. ShineHeat’s buyer notes for pre-selection live here: pre-selection. If your next GeM draft still reads like a proprietary PN dump, rewrite it as a model-and-compound RFQ before you hit publish.
Top comments (0)