DEV Community

Lynn
Lynn

Posted on Edited on

A Practical Integration Checklist for Discrete Manufacturers

Most integration projects fail not because the software is bad, but because teams treat it as an IT project instead of an operations problem. Before you connect anything, ask what handover you are trying to fix - then work backward.

Five handover points worth auditing first

  1. Quote to order: Does the sales team see the same availability and pricing data the factory commits to? CRM and ERP must share one source of truth.
  2. Order to production: When an order changes, does the shop floor plan update automatically? If a planner re-types data from ERP into a spreadsheet, this handover is broken.
  3. Production to quality: Can you trace a batch back to the machine, operator and material lots? Quality records living in paper or Excel kill traceability.
  4. Finished goods to shipping: When WMS picks and ships, does TMS know what left the building and when it will arrive?
  5. Shipping to invoicing: Do delivery milestones flow back to finance without manual status calls?

What a connected foundation looks like

The core loop from quote to delivery is covered end to end when CRM, ERP, MES, PLM, HR, WMS and TMS share one connected foundation. That does not mean one vendor for everything - it means every system speaks the same business events: order placed, production started, batch passed, goods shipped.

A pragmatic starting point

Do not replace everything overnight. Pick the handover that costs the most in overtime, rework or expedited freight, fix that one, and extend module by module. Our reference architecture covers the seven systems above and switches 12 languages automatically by visitor IP - useful for exporters whose customers and suppliers sit in different countries: www.sys.123app.cloud

Which handover is the most expensive one in your operation? Happy to compare notes.

Top comments (0)