It's easy to finish a sprint with great numbers and still have the feeling that something isn't working.
The team closed its tickets, maintained a decent velocity, and delivered on time. Yet technical debt keeps accumulating, the same problems keep coming back, and making changes to the codebase is becoming increasingly difficult.
So, what exactly are we measuring?
A lot of productivity discussions start with metrics. How many tickets were closed? How long did they take? How much work was completed?
These numbers are easy to collect. They're also easy to misunderstand. A simpler definition is more useful in this case:
Productivity is meaningful output relative to the resources invested.
Start with results
The first thing worth measuring is effectiveness. Did the work achieve the intended result? You can complete a task quickly, respect every requirement, and still fail to address the actual point. Efficient failure is still failure.
Engineering already provides a useful distinction through validation and verification:
- Validation: Did we build the right product for its intended use?
- Verification: Does the product conform to its requirements?
Imagine implementing a feature exactly as described in a ticket, only to discover that users needed something completely different.
The implementation might be excellent. The ticket might be closed. But the intended result hasn't been achieved. Before asking how fast something was done, we should probably ask whether it was worth doing in the first place.
Then look at the quality
Getting the intended result is one thing. Getting a result that remains useful is another.
Closing ten tickets isn't necessarily better than closing three. If those three eliminate the root causes of recurring bugs while the other ten introduce temporary patches, the ticket count doesn't explain much.
This is something we encounter regularly in software development. A solution can work perfectly today while making the next change unnecessarily complicated.
Poor design, unnecessary dependencies, and accumulated technical debt can turn initially fast development into increasingly expensive maintenance.
Quantity tells us how much was produced. Quality helps us understand how well it serves its purpose and whether it will continue to do so. What appears productive today can become a source of unnecessary work tomorrow.
Look at what the work consumes
Time is usually the easiest resource to measure, but it's only one part of the equation.
Work also consumes:
- Cognitive effort and attention.
- Coordination and handoffs.
- Tools and computing resources.
- Waiting and interruptions.
- Rework and maintenance.
Not every task requires measuring all of these. What matters is understanding which resources are significant for the work being performed.
Consider spending an additional hour automating a repetitive operation. Looking exclusively at today's delivery time, that decision might appear inefficient.
Looking at the next fifty executions of that operation, it might be one of the most productive decisions you made.
The interesting metric isn't necessarily the time spent. It's where resources are being consumed and what we're getting in return.
Productivity changes over time
Another limitation of metrics is that they often capture the present rather than trajectories.
A rough prototype can come together in an afternoon. Making it reliable, secure, and maintainable might take considerably longer.
The opposite can happen when debugging a difficult issue. You can spend hours investigating without changing a single line of code, then solve the problem with a surprisingly small modification.
Which part of that process was productive?
The investigation, the modification, or both? Learning, research, architecture, and problem discovery often require an initial investment before producing visible results.
Measuring productivity without considering that trajectory can make necessary work appear inefficient and fragile solutions appear exceptionally productive.
Productivity is better understood as a trajectory than as an isolated snapshot.
The model should learn from the work
This is where I think a productivity model becomes genuinely useful.
Rather than introducing another score against which developers are evaluated, we can treat productivity measurement as a feedback loop.
- Observe how the work is performed.
- Measure the results and resources consumed.
- Investigate patterns, hard parts, and unnecessary work.
- Adjust the working method.
- Observe what changes.
Maybe excessive coordination is slowing things down or maybe information arrives too late, the development environment introduces unnecessary friction, or recurring bugs reveal a problem with the existing architecture.
Maybe the method itself is simply inappropriate for that particular type of work.
The metrics help identify these problems, but they don't necessarily explain their causes. That requires understanding the system behind them.
The next iteration should incorporate what the previous one revealed.
Use metrics to improve the method, not the method to improve the metrics.
Instead of looking for a universal productivity score, we can start asking more useful questions:
- What produced the result?
- What did it consume?
- Where did unnecessary work appear?
- What could we change next time?
These are some of the foundations explored in the main article on productivity metrics. But understanding what to measure is only one part of building the model.
Things become considerably more interesting when we start examining how the measurements themselves influence the way we work.
Dive Deeper: Read the full, unabridged analysis on Work Enablement: Performance Is In Context.