DEV Community

Antlia Engineering Works
Antlia Engineering Works

Posted on

AODD Pump Installation Guide — Step by Step

Installation guide by Antlia Engineering Works — Mumbai, India.

📞 +91 9819395995 | 🌐 antliaworks.com

Steps

  1. Choose location — close to fluid source
  2. Install FRL unit on air inlet
  3. Connect suction line with Teflon tape
  4. Connect discharge line
  5. Start at 2 kg/cm², gradually increase
  6. Check all connections for leaks

Air Requirements

Model Min SCFM
AOD 150 8
AOD 300 15
AOD 400 25
AOD 500 40

Full guide: antliaworks.com

Top comments (0)