AODD Pump Installation Guide — Step by Step

A practical guide to installing and commissioning an AODD pump by Antlia Engineering Works — Mumbai, India.

📞 +91 9819395995 | 🌐 antliaworks.com

Installation Steps

  1. Choose Location — Close to fluid source, stable mounting
  2. Install FRL Unit — Filter, Regulator, Lubricator on air inlet
  3. Connect Suction Line — Same size as pump port, Teflon tape on threads
  4. Connect Discharge Line — Avoid restrictions and sharp bends
  5. Connect Air Supply — Via FRL unit, start at 2 kg/cm²
  6. Start Up — Gradually increase pressure, check for leaks

Air Requirements

Model Min SCFM
AOD 150 8 SCFM
AOD 300 15 SCFM
AOD 400 25 SCFM
AOD 500 40 SCFM