A practical guide to installing and commissioning an AODD pump by Antlia Engineering Works — Mumbai, India.
📞 +91 9819395995 | 🌐 antliaworks.com
Installation Steps
- Choose Location — Close to fluid source, stable mounting
- Install FRL Unit — Filter, Regulator, Lubricator on air inlet
- Connect Suction Line — Same size as pump port, Teflon tape on threads
- Connect Discharge Line — Avoid restrictions and sharp bends
- Connect Air Supply — Via FRL unit, start at 2 kg/cm²
- Start Up — Gradually increase pressure, check for leaks
Air Requirements
| Model | Min SCFM |
|---|---|
| AOD 150 | 8 SCFM |
| AOD 300 | 15 SCFM |
| AOD 400 | 25 SCFM |
| AOD 500 | 40 SCFM |
Full guide: antliaworks.com
Top comments (0)