DEV Community

Antlia Engineering Works
Antlia Engineering Works

Posted on

Six Steps to Fix Common AODD Pump Installation Problems

Troubleshooting guide by Antlia Engineering Works — Mumbai, India.

📞 +91 9819395995 | 🌐 antliaworks.com

Six Steps

  1. Check air pressure — minimum 2 kg/cm², recommended 4–6 kg/cm²
  2. Check SCFM — ensure compressor delivers enough volume
  3. Inspect suction line — check for air leaks, reduce lift height
  4. Check back pressure — reduce discharge line restrictions
  5. Lubricate — add SAE 40 oil at air inlet
  6. Inspect diaphragms — replace if ruptured or worn

Full guide: antliaworks.com

Top comments (0)